Citas bibligráficas
Carrera, J., Paredes, W. (2021). Propuesta de aplicación del lean construction para mejorar la planificación y el control en la ejecución de la partida UBS de las obras de saneamiento rural en la empresa Ripesa Perú E. I. R. L. - 2020 [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/27709
Carrera, J., Paredes, W. Propuesta de aplicación del lean construction para mejorar la planificación y el control en la ejecución de la partida UBS de las obras de saneamiento rural en la empresa Ripesa Perú E. I. R. L. - 2020 [Tesis]. PE: Universidad Privada del Norte; 2021. https://hdl.handle.net/11537/27709
@misc{renati/512027,
title = "Propuesta de aplicación del lean construction para mejorar la planificación y el control en la ejecución de la partida UBS de las obras de saneamiento rural en la empresa Ripesa Perú E. I. R. L. - 2020",
author = "Paredes Paredes, Will Anthony",
publisher = "Universidad Privada del Norte",
year = "2021"
}
The company Ripesa Perú executes projects tendered to the public sector and as such arises the urgent need to meet the execution deadlines stipulated in their contracts. The Initiative of the Peruvian State with the entry into force of the R.M. 192-2018 OF THE MVCS, is that the components of the water systems are more standardized, which leads to the establishment of new working methods that improve production and productivity in the execution of work and, more importantly, that these improvements can be replicated in more works. Under this criterion, it was proposed to implement the lean Construction philosophy in the company, specifically at UBS's departure from a rural sanitation work; We apply the Balance Chart tool in the execution stage to determine the distribution of time in a given activity, obtaining the results that: 21% of the work time is TP, 30% of the TC time, 49% of the work time is TNC. The activity train tool and last planner were applied to the UBS game. Proposing a schedule of execution activities based on the latest planner and with the commitment of all those involved (logistics, technical team, operators, laborers, etc.). .
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons