Arqque, J., Rojas, J. (2016). Elaboración de un proceso para optimizar el desarrollo de planos constructivos para la fabricación de bobinas eléctricas en la empresa Delcrosa Electromecánica [Trabajo de suficiencia profesional, Universidad Privada del Norte]. https://hdl.handle.net/11537/10885
Arqque, J., Rojas, J. Elaboración de un proceso para optimizar el desarrollo de planos constructivos para la fabricación de bobinas eléctricas en la empresa Delcrosa Electromecánica [Trabajo de suficiencia profesional]. PE: Universidad Privada del Norte; 2016. https://hdl.handle.net/11537/10885
@misc{renati/510869,
title = "Elaboración de un proceso para optimizar el desarrollo de planos constructivos para la fabricación de bobinas eléctricas en la empresa Delcrosa Electromecánica",
author = "Rojas Mamani, Jessica Lizabeth",
publisher = "Universidad Privada del Norte",
year = "2016"
}
ABSTRACT This work research has been done in Delcrosa Electro mechanics, a Peruvian company dedicated to the design and manufacture of electric transformers of different ratings. It supplies to different industries and develops projects throughout Peru. The areas of research and design are constantly improved in order to optimize electrical and mechanical designs, engineers are also trained to provide adequate consulting to clients. Delcrosa’s manufacturing process is enhanced by its well equipped facilities and the area of quality control which ensures an optimal product output. Within the company’s overall business process framework, our focus will be more on the process of creating electrical drawings for transformer coils. Currently this design process is not standardized, which results in delayed deliveries to clients. Hence, our proposal will be to create a well-balanced standardized process to improve our work timeframe. In order to determine where the bottleneck happens, causing delays within the design process, a test was made. The test consisted on taking times of three average designers, to have an average time of how long it takes to make an electrical drawing, using the current designing method process within the company. These times will later serve to be compared with the times registered using the new standardized design process we are proposing. Our proposal details verification, development and application procedures as well as the use of software, which will help specifically in the verification development of transversal cuts and regulation cuts, helping the designer elaborate transformer coil drawings in a faster an efficient way. As mentioned before a comparison between the original company’s method and our proposal was to be made in order to provide us with an actual percentage of efficiency between both. Hence another time test was made, and the results detailed that our proposal reduced time by 53% thus making it more efficient. Not only does our new standardized process optimize work hours, reduces errors, eliminates extra hours, it also provides a powerful tool for the company which will help train new workers.
IMPORTANTE
La información contenida en este registro es de entera responsabilidad de la universidad, institución o escuela de educación superior que administra el repositorio académico digital donde se encuentra el trabajo de investigación y/o proyecto, los cuales son conducentes a optar títulos profesionales y grados académicos. SUNEDU no se hace responsable por los contenidos accesibles a través del Registro Nacional de Trabajos de Investigación – RENATI.