Anchayhua, Z., (2018). Plan de mejora para incrementar la productividad del proceso de instalación de postes de suministros eléctricos en la empresa Prodiel Perú S. A. C. en el año 2017 [Trabajo de suficiencia profesional, Universidad Privada del Norte]. https://hdl.handle.net/11537/15221
Anchayhua, Z., Plan de mejora para incrementar la productividad del proceso de instalación de postes de suministros eléctricos en la empresa Prodiel Perú S. A. C. en el año 2017 [Trabajo de suficiencia profesional]. PE: Universidad Privada del Norte; 2018. https://hdl.handle.net/11537/15221
@misc{renati/510443,
title = "Plan de mejora para incrementar la productividad del proceso de instalación de postes de suministros eléctricos en la empresa Prodiel Perú S. A. C. en el año 2017",
author = "Anchayhua Chate, Zenaida",
publisher = "Universidad Privada del Norte",
year = "2018"
}
The main objective of this research was to increase the productivity of the installation process of power supply poles in the Prodiel Perú S.A.C. company in the year 2017. To achieve this, the initial situation of the pole installation process was first analyzed using the Ishikawa diagram and Pareto Diagrams, balances were used to measure the productive, contributory, non-contributory time, operation diagrams and process activities, as well as management indicators for the analysis and diagnosis of the activities that show the problematic reality given for the low productivity in the process object of study. Subsequently, the design of the improvement plan was developed based on the Deming cycle, which consists of stages such as planning, doing, verifying and acting with it. It was sought that the improvement plan composed of specific actions would increase productivity, these actions were: the acquisition of new tools for the execution of the work, the training program for the operative personnel and the equipment rental in the site, this allowed to reduce the time of the installation process from 335 minutes to 170 minutes, and also increase the monthly average of installed poles. 88 posts to 139 posts, achieve the increase of the average monthly productivity indicator in 2016 from 7,86 pp / hh to an average monthly productivity of 12,44 pp / hh in 2017, which shows a percentage increase of 58%, confirming the benefit The improvement plan also increased the training rate from 0% to 100% for the benefit of the work in the analyzed area. Finally, it was determined that the economic impact of the improvement plan could generate an economic benefit of S /. 38 145,18 soles, considering an implementation cost of S /. 33 907,60 soles, a cost-benefit ratio of 1,12 was also determined, which indicates that the improvement plan was economically viable for the works area and for the PRODIEL PERÚ S.A.C. company in 2017.