Marquina, O., (2018). Incidencia del cálculo de reservas en la viabilidad de explotación de la concesión San Juan, empresa Calinor S.A.C, Cajamarca, 2018 [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/14177
Marquina, O., Incidencia del cálculo de reservas en la viabilidad de explotación de la concesión San Juan, empresa Calinor S.A.C, Cajamarca, 2018 [Tesis]. PE: Universidad Privada del Norte; 2018. https://hdl.handle.net/11537/14177
@misc{renati/509653,
title = "Incidencia del cálculo de reservas en la viabilidad de explotación de la concesión San Juan, empresa Calinor S.A.C, Cajamarca, 2018",
author = "Marquina Vega de Salas, Olivia Soledad",
publisher = "Universidad Privada del Norte",
year = "2018"
}
The general objective of this thesis is to determine the level of impact of the calculation of reserves on the operating viability of the San Juan concession, Calinor SAC Company, Cajamarca, 2018. For this purpose, the influence of the classification of the quality of the the concession rock, define the effect of cubing the reserves of the concession and finally specify the degree of impact of the analysis of the technical - economic feasibility (cash flow) in the exploitation of the concession. The calculation of reserves also allows planning in the near future, depending on the interests. For this, many aspects must be taken into consideration such as the mining strata, resolutions dictated by competent bodies such as the Ministry of Energy and Mines or the Ministry of Industry. The type of research is descriptive since it gathers a set of logical and practical processes and procedures that allow to identify, the research design is descriptive and applicative, since the conditions of the limestone deposit to be exploited will be described, of which they will calculate reserves. It was concluded that the method of the profiles for the calculation of the reserves, although it is a somewhat traditional method, has good precision if the appropriate distances are taken, taking into account the variation of the topography. It was determined that the total reserves of the entire area are 5 523 753.348 tn. The monthly production on average is 45,000 MT. The method of exploitation in the area was established bank by demolition, which has as constituent elements to a final slope angle equal to 21 °, bank angle equal to 60 ° and a bank width established in 7.5m. The safety, occupational health and environmental management standards are governed by the norms and the general mining law according to supreme decree 024 EM.