Flores, F., Franco, C. (2021). Procedimiento de trabajo y la mejora en el sistema de gestión de seguridad en la empresa Metales Ingeniería y Construcción S. A. C. [Trabajo de suficiencia profesional, Universidad Privada del Norte]. https://hdl.handle.net/11537/27413
Flores, F., Franco, C. Procedimiento de trabajo y la mejora en el sistema de gestión de seguridad en la empresa Metales Ingeniería y Construcción S. A. C. [Trabajo de suficiencia profesional]. PE: Universidad Privada del Norte; 2021. https://hdl.handle.net/11537/27413
@misc{renati/509188,
title = "Procedimiento de trabajo y la mejora en el sistema de gestión de seguridad en la empresa Metales Ingeniería y Construcción S. A. C.",
author = "Franco Blas, Christhian Jesús",
publisher = "Universidad Privada del Norte",
year = "2021"
}
The purpose of this thesis project is to analyze the action plan through the Gantt schedule in which three plans are established: a) Training Program, b) Action Mock and c) Procedures, so that the general objective is carry out the improvement of the Occupational Health and Safety Management System, in the Project Area of the Company Metales Ingeniería Construcción S.A.C. This research is carried out with the purpose of contributing to the existing knowledge on management by processes and the SG-SST, accompanied by knowledge on safety and prevention of occupational risks, in order to expand the line of research from 2018 to 2019 in the activities of the Company Metales Ingeniería Construcción S.A.C., to optimize them. Thus, the company had projects of approximately 55 million between the years 2018 and 2019, of which the profit margin is %, for which a profit margin of 2.5 million is estimated. From this figure an estimated value of 2% is taken as a marginal utility for the implementation of the action plan for the project. It is worth mentioning that the company handles an average of five projects per year with an average annual investment of 70 million. As a result, it was obtained that the VANE is S/.60,134.81 showing that the value is greater than zero, therefore, the action plan is viable for the company. On the other hand, the TIRE is 57.45% fulfilling the suggested range between 40% to 60%, showing the maximum profitability that the company can demand from the action plan. Finally, the cost / benefit is S/1.20, which means that for every sol invested in the project that amount is earned.