Bibliographic citations
Alba, J., (2021). Implementación de procesos de planificación, monitoreo y control, basada en la Guía del PMBOK 6ta. edición, en el área de Ingeniería de una consultora de ingeniería y construcción [Universidad de Lima]. https://hdl.handle.net/20.500.12724/14697
Alba, J., Implementación de procesos de planificación, monitoreo y control, basada en la Guía del PMBOK 6ta. edición, en el área de Ingeniería de una consultora de ingeniería y construcción []. PE: Universidad de Lima; 2021. https://hdl.handle.net/20.500.12724/14697
@misc{renati/503213,
title = "Implementación de procesos de planificación, monitoreo y control, basada en la Guía del PMBOK 6ta. edición, en el área de Ingeniería de una consultora de ingeniería y construcción",
author = "Alba Espinoza, Jhoel Aparicio",
publisher = "Universidad de Lima",
year = "2021"
}
The present work of professional sufficiency consists of the implementation of the planning, monitoring and control processes based on the PMBOK Guide, in the Engineering area of the consulting company JAD Ingenieros Consultores, (fictitious name chosen to protect the confidentiality of the company) that provides engineering and construction services in the mining sector. The project was carried out in 2017 with the aim of being able to improve the metrics of time, cost and scope of project management and thus be able to obtain economic benefits. The first chapter refers to the internal and external analysis of the company through the use of Industrial Engineering tools such as Porter's five (5) forces, EFE matrix, EFI matrix and Pestel analysis. The second chapter describes the general objective and the specific objectives of this research. In the third chapter, the service awarded by a mining company is detailed as the scope of the research. The fourth chapter describes the technical, economic and social justifications that demonstrate the feasibility of the project. In the fifth chapter, also using an industrial engineering tool such as the Ishikawa diagram, the main causes of the problem identified in this case study are determined. With this, the solution alternative is selected and its engineering is carried out. Finally, the implementation plan is described and the economic evaluation is presented, showing the economic benefits.
This item is licensed under a Creative Commons License