Citas bibligráficas
Olivas, D., Saavedra, K. (2024). Propuesta de mejora en la gestión del almacén para reducir el incumplimiento de la entrega de mercadería utilizando la filosofía lean warehousing y la metodología 5S en una empresa comercializadora metalmecánica de productos masivos y estructurales [Trabajo de Suficiencia Profesional, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/673273
Olivas, D., Saavedra, K. Propuesta de mejora en la gestión del almacén para reducir el incumplimiento de la entrega de mercadería utilizando la filosofía lean warehousing y la metodología 5S en una empresa comercializadora metalmecánica de productos masivos y estructurales [Trabajo de Suficiencia Profesional]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2024. http://hdl.handle.net/10757/673273
@misc{renati/416062,
title = "Propuesta de mejora en la gestión del almacén para reducir el incumplimiento de la entrega de mercadería utilizando la filosofía lean warehousing y la metodología 5S en una empresa comercializadora metalmecánica de productos masivos y estructurales",
author = "Saavedra Revatta, Karen",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2024"
}
During 2019, the manufacturing sector recognized a depreciation in the production index of 1.68% with respect to 2018. Within this sector, there is the non-primary manufacturing subsector, and it is located in the metal-mechanic sector (INEI, 2020). In this area, there is a small company, which has presented a major problem: the non-fulfillment of its orders on the stipulated date. To address this problem, first of all, the Value Stream Mapping (VSM) strategy was used to observe those tasks that do not add value to the processes, as well as the level of turnover, the flow of goods and the productivity of the company. With this, it was possible to identify that inadequate warehouse management and inventory management are the factors that have caused this problem, and these factors were caused by inadequate inventory control procedures, unnecessary movements and additional order preparation time. In addition, the proposal consists of formulating a demand forecasting method, and is complemented by the use of the ABC Multicriteria tool. In addition, to efficiently manage the warehouse study, the safety stock and a process standardization that goes hand in hand with the Lean philosophy were determined. For the validation, Arena software was used in order to determine the resulting decrease in the non-fulfillment of customer orders through Arena software.
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons