Citas bibligráficas
Andres, B., Avila, J. (2023). Implementación de un procedimiento de integración de lecciones aprendidas utilizando la metodología PMBOK y SCRUM para reducir los tiempos de obtención de las lecciones aprendidas en la empresa GRUPO POMAL CONSTRUCTORA SAC [Trabajo de Suficiencia Profesional, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/670241
Andres, B., Avila, J. Implementación de un procedimiento de integración de lecciones aprendidas utilizando la metodología PMBOK y SCRUM para reducir los tiempos de obtención de las lecciones aprendidas en la empresa GRUPO POMAL CONSTRUCTORA SAC [Trabajo de Suficiencia Profesional]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2023. http://hdl.handle.net/10757/670241
@misc{renati/409702,
title = "Implementación de un procedimiento de integración de lecciones aprendidas utilizando la metodología PMBOK y SCRUM para reducir los tiempos de obtención de las lecciones aprendidas en la empresa GRUPO POMAL CONSTRUCTORA SAC",
author = "Avila Armillon, Jeselind Meidy",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2023"
}
The objective of this research was the Implementation of a procedure for integrating lessons learned using the PMBOK and SCRUM methodology in the technical area of the company GRUPO POMAL CONSTRUCTORA SAC, 2023. This is due to the reason, which was identified through the application of a survey that It consists of eleven questions asked fifteen workers from the areas of: Engineering and Design, Planning and Control; and Construction, Inspection and Supervision, that only 33.3% of respondents know and know what the lessons learned are for and 66.7% do not; while only 13.3% know the company's lessons learned and 86.7% do not; This is because they are not easily accessible for search, registration and storage. Such a situation reflects delays in solving problems in civil works projects that were previously solved effectively, thus not optimizing the company's time and resources. For this reason, the proposed procedure specifically details each step that workers must follow for its registration, approval and storage with friendly access that guarantees the safeguarding of existing information and the loading of future data of the lessons learned; so that the company's workers can improve their response capacity and solution alternatives in future projects where similar problems are encountered; which results in the optimization of time and resources, this last point is corroborated with the results of the satisfaction survey.
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons