Lozano, M., Manturano, V. (2020). Comparación entre el sistema last planner y el sistema tradicional en dos obras, durante la etapa de estructuras, Dpto. de San Martin 2020 [Trabajo de investigación, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/655850
Lozano, M., Manturano, V. Comparación entre el sistema last planner y el sistema tradicional en dos obras, durante la etapa de estructuras, Dpto. de San Martin 2020 [Trabajo de investigación]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2020. http://hdl.handle.net/10757/655850
@mastersthesis{renati/395278,
title = "Comparación entre el sistema last planner y el sistema tradicional en dos obras, durante la etapa de estructuras, Dpto. de San Martin 2020",
author = "Manturano Arteaga, Victor Hugo",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2020"
}
The purpose of this research work is generated by the need to find the most efficient way to manage the work schedule during the structures stage in two hospitals located in the San Martín region, for which an analysis is carried out in both works, given that one of them worked under the traditional system and the second under the guidelines of the Last Planner, this with the aim of determining which is more efficient. In this sense, a comparative of the Last Planner system in construction versus the traditional planning approach is developed (Gantt schedule, critical path), as will be described in chapters 3 and 4. In Chapter 1, the general aspects of this work are detailed, the problem, the different hypotheses, the general objective and the specific objectives are indicated, as well as the methodology to be followed and the expected results. In Chapter 2, the entire theoretical framework of the Last Planner system is detailed, a tool that is part of the “lossless construction” or “Lean Construction” philosophy that emerged in the 1990s and came from the adaptation of “Lean Production” and the foundations for project management. In Chapter 3, the analysis of each work is carried out, the first under the traditional system and the second for the main concepts and tools of the Last Planner System in order to generate a solid theoretical base to support this research work. In Chapters 4 and 5, a comparison was made in the execution of both hospitals, obtaining as a result a better development in programming control in hospital B, which, as explained, worked under the guidelines of the Last Planner System, However, it should also be taken into account that the expected values could not be reached due to climatic factors typical of the work area, in any case it was above the values obtained in the hospital A indicators, developed under the traditional system. Finally, the material of this research work will serve as a starting point for the application of the latest planner system in different construction project.