Buscar en Google Scholar
Título: Pozos de bombeo, como alternativa para reducir los efectos de licuación de suelos
Otros títulos: Pumping wells as an alternative to reduce liquefaction effects of soils
Asesor(es): Aybar Arriola, Gustavo Adolfo
Fecha de publicación: 18-jul-2020
Institución: Universidad Peruana de Ciencias Aplicadas (UPC)
Resumen: En esta investigación se presenta el análisis del costo de construcción e instalación del pozo de bombeo tipo tubular y la eficiencia de este mismo, en zonas susceptibles a licuación de suelos, para reducir su vulnerabilidad sísmica. Las zonas susceptibles, se determinaron con el cálculo del factor de seguridad del potencial de licuación de Seed e Idriss. En la etapa inicial, sin la instalación de los pozos, el FS resultó menor a la unidad (FS<1), ya que, la zona de estudio presenta nivel freático superficial. El mismo, que tiene una alta incidencia en la ocurrencia de licuación, debido a que se genera una excesiva presión de poros originada por los sismos que reducen los esfuerzos efectivos del suelo hasta hacerlos nulo. Con ello, el suelo pierde toda resistencia. Con la instalación de pozos, se logró incrementar el FS por encima de la unidad (FS>1). Para ello fue necesario la instalación de 4 pozos tubulares, con caudal de bombeo unitario de 20 litros/seg y una profundidad de 3.0 m, para un área de 1.20 Ha. La profundidad de los pozos y el caudal de bombeo deberá garantizar el abatimiento del nivel freático por encima de la profundidad óptima para que se mitigue la licuación de suelos. Finalmente, costo de construcción e instalación de los pozos, asciende a $. 14,270.90 dólares.

This research presents the analysis of the cost of construction and installation of the tubular type pumping well and its efficiency, in areas susceptible to soil liquefaction, to reduce its seismic vulnerability. The susceptible areas were determined with the calculation of the safety factor of the liquefying potential of Seed and Idriss. In the initial stage, without the installation of the wells, the FS was less than unity (FS <1), since the study area has a surface water table. The same, which has a high incidence in the occurrence of liquefaction, due to the excessive pore pressure generated by earthquakes that reduce the effective stresses of the soil until they are null. With this, the ground loses all resistance. With the installation of wells, it was possible to increase the FS above the unit (FS> 1). For this, it was necessary to install 4 tubular wells, with a unit pumping flow of 20 liters / sec and a depth of 3.0 m, for an area of ​​1.20 Ha. The depth of the wells and the pumping flow should guarantee the abatement of the water table above the optimal depth to mitigate the liquefaction of soils. Finally, the cost of construction and installation of the wells amounts to $. $ 14,270.90.
Enlace al repositorio: http://hdl.handle.net/10757/652568
Disciplina académico-profesional: Ingeniería Civil
Institución que otorga el grado o título: Universidad Peruana de Ciencias Aplicadas (UPC). Facultad de ingeniería
Grado o título: Bachiller en Ingeniería Civil
Fecha de registro: 30-ago-2020



Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons