Bibliographic citations
Carbajal, J., Luna, J., Vega, J. (2019). Uso de sistema constructivo de prelosas para optimizar tiempo, mejorar costos y margen de las empresas que se dedican a la construcción de edificios multifamiliares no mayores de 12 pisos, casos de estudio A y B [Trabajo de investigación, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/652498
Carbajal, J., Luna, J., Vega, J. Uso de sistema constructivo de prelosas para optimizar tiempo, mejorar costos y margen de las empresas que se dedican a la construcción de edificios multifamiliares no mayores de 12 pisos, casos de estudio A y B [Trabajo de investigación]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2019. http://hdl.handle.net/10757/652498
@mastersthesis{renati/391070,
title = "Uso de sistema constructivo de prelosas para optimizar tiempo, mejorar costos y margen de las empresas que se dedican a la construcción de edificios multifamiliares no mayores de 12 pisos, casos de estudio A y B",
author = "Vega Jaime, Jean Carlo",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2019"
}
The research study entitled “Using a preslab construction system to optimize time, improve the cost and margin of companies engaged in the construction of multifamily buildings no larger than 12 floors, case study A and B“, was developed with the purpose of demonstrate that using the preslab construction system will improve deadlines, costs and operating margins in the construction of multifamily buildings. The research focuses on two projects of the company Proyec Contratistas Generales S.A, based on the improvements obtained in the management of projects “Varela 1270” and “Varela 879”. This investigation responds to a study of the applicative type of quantitative nature and design is descriptive. In addition, it introduces the concepts of using prefabricated construction systems, deadlines, cost and margin assessment in projects “Varela 1270” and “Varela 879” to analyze the data obtained and be compared with the use of traditional construction systems, focusing on existing differences between each construction system, which corresponds to one of the causalities that affected the cost and timeframe of the execution of the work. The use of the construction system of pre-wears in buildings, has a difference of 20% in the period of implementation compared to a traditional construction system. In addition, the elimination of implicit processes such as; ceiling taraging activity, material optimization and labor. They mean savings of S/. 76,921.76 for the “Varela 1270“ (project A) and S/project. 60,553.24 for the “Varela 879“ (project B).
This item is licensed under a Creative Commons License