Bibliographic citations
Quispe, T., (2020). Reducción de Pérdidas Económicas Aplicando Tecnología No Tradicional en la Instalación de Tuberías Hasta 300 mm en Paracas - Pisco [Tesis, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/652432
Quispe, T., Reducción de Pérdidas Económicas Aplicando Tecnología No Tradicional en la Instalación de Tuberías Hasta 300 mm en Paracas - Pisco [Tesis]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2020. http://hdl.handle.net/10757/652432
@misc{renati/390828,
title = "Reducción de Pérdidas Económicas Aplicando Tecnología No Tradicional en la Instalación de Tuberías Hasta 300 mm en Paracas - Pisco",
author = "Quispe Romero , Teresa Cynthia",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2020"
}
The objective of this research work is to determine the percentage of reduction of economic losses in the installation of pipes with the use of non-traditional technology in the Oasis project, identifying the production and cost indexes with traditional technology with trenching, and Make the respective comparison with the production and cost indexes with the Non-traditional Rocket Ploguh technology. The quality consists of the installation by means of a vibrator directly under the ground, without the need for conventional trenching. For which three analysis scenarios are proposed, the first is a simulation of the time, productivity and costs of pipe installation in the Oasis project using traditional technology with trenching, the second is the measurement in time, productivity and costs, which are incurred during pipe installation using Rocket Plow technology, the third scenario is the pipe installation simulation of a process activated using Rocket Plow technology. Finally, the productivity of labor and equipment is obtained for the three scenarios proposed, to make the respective comparison and determine the percentage of increase in productivity of both resources, comparing the costs in the three scenarios, to determine the percentage of final cost reduction with the use of Rocket Plow technology, thus having productivity and cost relationships for the execution of pipe installation projects.s.
This item is licensed under a Creative Commons License