Bibliographic citations
Vilcas, J., Cier, A. (2020). Evaluación de los riesgos debido a un depósito informal de desmonte de mina frente a una comunidad – Caso Depósito de Desmonte en Pataz Trujillo [Tesis, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/651815
Vilcas, J., Cier, A. Evaluación de los riesgos debido a un depósito informal de desmonte de mina frente a una comunidad – Caso Depósito de Desmonte en Pataz Trujillo [Tesis]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2020. http://hdl.handle.net/10757/651815
@misc{renati/390345,
title = "Evaluación de los riesgos debido a un depósito informal de desmonte de mina frente a una comunidad – Caso Depósito de Desmonte en Pataz Trujillo",
author = "Cier Acevedo, Augusto Julio",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2020"
}
Disaster management in Peru is necessary to overcome the various phenomena to which our country is prone. However, this is still incipient and incomplete. One of these cases is the one we studied in this investigation. An informal mine located in the region of La Libertad, in the district of Pataz, has been pouring waste material over a natural slope and has reached a critical point of impending landslide. The volume deposit is approximately 35,000 m3 and is located on an inhabited town. Therefore, this thesis proposes an analysis of the risk, studying the danger and its nature, and the level of vulnerability of those affected. For this, we follow risk analysis manuals of the Peruvian state and add geotechnical criteria and slope stability analysis in its static and pseudo static condition. Finally, ways of mitigating the risk of slipping are proposed. In chapter one, theoretical concepts on slope stability, shear strength, limit balance are reviewed. In addition, the reality of informality in Peru is reviewed. Finally, concepts that help to analyses the risk are defined. The second chapter explains the methodology to be applied for slope stability analysis and for the risk analysis process. In the third chapter, the details of the study area are reached as well as the investigations and tests carried out on the geotechnical components present. In the fourth chapter the development of the stability analysis is done, explaining the results and the hypotheses taken. The entire risk analysis is developed in the fifth chapter, step by step, explaining the assessment of danger and vulnerability.
This item is licensed under a Creative Commons License