Look-up in Google Scholar
Full metadata record
Vértiz Malabrigo, Manuel Alberto (es_PE)
López Cabrera, Walter Diego (es_PE)
Ninaquispe Alvites, Elvis Johan (es_PE)
López Cabrera, Walter Diego (es_PE)
2024-01-19T20:35:38Z
2024-01-19T20:35:38Z
2024
https://hdl.handle.net/20.500.12759/18951
En el presente proyecto La aplicación de la filosofía Lean Construction y el sistema Last Planner en la ejecución del Centro Educativo N° 80669 San José Pacasmayo tiene como objetivo principal mejorar la eficiencia y la productividad del proyecto. Al implementar estos enfoques, se busca optimizar los flujos de trabajo, reducir las pérdidas y maximizar el uso de los recursos disponibles. Para lograrlo, se realizarán acciones como la capacitación del personal en los principios y conceptos de Lean Construction y Last Planner, la formación de equipos colaborativos, la implementación del sistema Last Planner para la programación y control de actividades, la mejora continua mediante la identificación de oportunidades de mejora y la implementación de soluciones innovadoras, la gestión eficiente del abastecimiento de materiales, el uso de indicadores de desempeño para medir y monitorear la eficiencia del proyecto, y la promoción de una comunicación efectiva entre todos los miembros del equipo. se lleva a cabo un análisis exhaustivo de la Institución Educativa pública seleccionada. En este análisis se detallan las características propias de este tipo de proyectos, así como las directrices que deben seguirse durante la construcción. Además, se proporciona una estadística actualizada sobre los proyectos en curso en la zona. Donde, se realiza un diagnóstico específico de la obra piloto seleccionada, la cual se centra en la construcción de la Institución Educativa. Se examina detalladamente la organización de la obra y se destacan los proyectos previamente ejecutados en la región. Se hace especial énfasis en la forma en que se han manejado los requerimientos de equipos y materiales, el transporte de materiales al lugar de trabajo, la contratación de mano de obra y subcontratistas, el pago a proveedores, y las deficiencias identificadas en el expediente técnico de la obra. Finalmente, se realiza un diagnóstico exhaustivo de los problemas y dificultades que se han enfrentado en la construcción de Instituciones Educativas públicas en la zona de Pacasmayo, resaltando los principales desafíos que han enfrentado los encargados de la ejecución de las obras en esta parte de Perú. (es_PE)
In the present project The application of the Lean Construction philosophy and the Last Planner system in the execution of the Educational Center No. 80669 San José Pacasmayo has as its main objective to improve the efficiency and productivity of the project. By implementing these approaches, you seek to optimize workflows, reduce waste, and maximize the use of available resources. To achieve this, actions will be carried out such as the training of personnel in the principles and concepts of Lean Construction and Last Planner, the formation of collaborative teams, the implementation of the Last Planner system for the programming and control of activities, continuous improvement through the identification of opportunities for improvement and the implementation of innovative solutions, the efficient management of the supply of materials, the use of performance indicators to measure and monitor the efficiency of the project, and the promotion of effective communication among all team members. an exhaustive analysis of the selected public Educational Institution is carried out. This analysis details the characteristics of this type of project, as well as the guidelines that must be followed during construction. In addition, updated statistics on ongoing projects in the area are provided. Where, a specific diagnosis of the selected pilot work is carried out, which focuses on the construction of the Educational Institution. The organization of the work is examined in detail and the projects previously executed in the region are highlighted. Special emphasis is placed on the way in which the requirements for equipment and materials have been handled, the transportation of materials to the workplace, the hiring of labor and subcontractors, the payment to suppliers, and the deficiencies identified in the technical file. of the work Finally, an exhaustive diagnosis of the problems and difficulties that have been faced in the construction of public Educational Institutions in the Pacasmayo area is made, highlighting the main challenges that those in charge of executing the works in this part of Peru have faced (es_PE)
Tesis (es_PE)
application/pdf (es_PE)
spa (es_PE)
Universidad Privada Antenor Orrego (es_PE)
T_CIVIL_2456
info:eu-repo/semantics/closedAccess (es_PE)
https://creativecommons.org/licenses/by/4.0/ (es_PE)
Lean Construction (es_PE)
Lst Planner (es_PE)
Influencia de la filosofía Lean Construction - Last Planner en la ejecución del Centro Educativo N° 80669 San José Pacasmayo – 2022 (es_PE)
info:eu-repo/semantics/bachelorThesis (es_PE)
Universidad Privada Antenor Orrego. Facultad de Ingenieria (es_PE)
Ingenieria Civil (es_PE)
Ingeniero Civil (es_PE)
PE (es_PE)
http://purl.org/pe-repo/ocde/ford#2.01.00 (es_PE)
http://purl.org/pe-repo/renati/level#tituloProfesional (es_PE)
18112316
https://orcid.org/0000-0001-9168-8258 (es_PE)
71198629
45601792
732016 (es_PE)
Gálvez Paredes, José Alcides (es_PE)
López Carranza, Atilio Rubén (es_PE)
Geldres Sánchez, Carmen Lucía (es_PE)
http://purl.org/pe-repo/renati/type#tesis (es_PE)
Privada asociativa



This item is licensed under a Creative Commons License Creative Commons