Bibliographic citations
Jara, S., (2021). Planeamiento de las estructuras de la red de agua potable y alcantarillado sanitario para la implementación de estos servicios en el barrio 6B y barrio 7B del Centro Poblado Alto Trujillo del distrito de El Porvenir – provincia de Trujillo – La Libertad, 2020 [Tesis, Universidad Privada Antenor Orrego - UPAO]. https://hdl.handle.net/20.500.12759/7105
Jara, S., Planeamiento de las estructuras de la red de agua potable y alcantarillado sanitario para la implementación de estos servicios en el barrio 6B y barrio 7B del Centro Poblado Alto Trujillo del distrito de El Porvenir – provincia de Trujillo – La Libertad, 2020 [Tesis]. PE: Universidad Privada Antenor Orrego - UPAO; 2021. https://hdl.handle.net/20.500.12759/7105
@misc{renati/380131,
title = "Planeamiento de las estructuras de la red de agua potable y alcantarillado sanitario para la implementación de estos servicios en el barrio 6B y barrio 7B del Centro Poblado Alto Trujillo del distrito de El Porvenir – provincia de Trujillo – La Libertad, 2020",
author = "Jara Vasquez, Stwen Anderson",
publisher = "Universidad Privada Antenor Orrego - UPAO",
year = "2021"
}
The objective of this thesis is to carry out the design of the Sewerage and Drinking Water System in Barrio 6B and Barrio 7B of the Centro Poblado Alto Trujillo of the El Porvenir District, whose sectors still do not have these basic services, living in terrible conditions of sanitation and consuming non-potable water. The pertinent field studies were carried out, such as the verification in the field of the number of lots and the direction where they would drain, the projected population was calculated, the flow of domestic and non-domestic demand was also calculated for the different nodes, it was not found an area of industrial use for which an industrial demand flow was not calculated. The calculation of the contribution flow of certain projected areas such as health centers, an educational institution, parks, markets and other uses was carried out. Regarding the Sewerage System, a pre-design of projected mailboxes was carried out, calculating the contribution basins mailbox by mailbox to drain the existing mailboxes to our own. Having all the pre-design of the system, the Topographic Survey of the area was carried out to know the slopes and begin with the Design itself. Referring to the design, we comply with the basic design parameters such as in the Sewerage System to meet the tractive force condition greater than or equal to one Pascal (1 Pa), in the Drinking Water System to meet the minimum speeds (0.6 m / s) and maximum (3 m / s), pressures not less than 10 mca and not greater than 50 mca at each node.
This item is licensed under a Creative Commons License