Bibliographic citations
Martínez, M., (2023). Aplicación Guía PMBOK, para fortalecer Gestión de Cronograma, Costos y Calidad del Proyecto Construcción Institución Educativa N° 80937, Canibamba Alto, Usquil [Tesis, Universidad Privada Antenor Orrego]. https://hdl.handle.net/20.500.12759/10675
Martínez, M., Aplicación Guía PMBOK, para fortalecer Gestión de Cronograma, Costos y Calidad del Proyecto Construcción Institución Educativa N° 80937, Canibamba Alto, Usquil [Tesis]. PE: Universidad Privada Antenor Orrego; 2023. https://hdl.handle.net/20.500.12759/10675
@misc{renati/380030,
title = "Aplicación Guía PMBOK, para fortalecer Gestión de Cronograma, Costos y Calidad del Proyecto Construcción Institución Educativa N° 80937, Canibamba Alto, Usquil",
author = "Martínez Rosas, Mayer Anghelo",
publisher = "Universidad Privada Antenor Orrego",
year = "2023"
}
This thesis has proposed the PMBOK Guide Application, to strengthen Schedule, Cost and Quality Management of the Project Construction Educational Institution No. 80937, Canibamba, Usquil, for compliance with the deadlines granted by the client in phase 1 of the project. Construction of Educational Institution No. 80937, Canibamba, Usquil. The study method of this research work was deductive, with a mixed approach (quantitative and qualitative), non-experimental and with a cross-sectional design. The application of the 6 processes of schedule management, of the 4 processes of Cost management and of the 3 processes of quality management was carried out and the following results were obtained: planning the management of schedule, costs and quality , so the schedule management plan was obtained, define the activities, the list of project milestones was obtained; sequencing the activities, the network diagram of the project was obtained; estimate the duration, the work period of the activities was obtained; develop the schedule, the base schedule, base costs and the base quality of the project were obtained, the techniques to control the project threshold were obtained. Finally, the research provided positive results before the proposal and difficulty in accepting the application of the PMBOK Guide to strengthen Schedule, Cost and Quality Management, using the PMBOK guidelines, for the Construction of the Educational Institution No. 80937, culminating on June 25, 2022, meaning a breach of 15 days of delay in the delivery of the work by the contractor company