Citas bibligráficas
Vásquez, W., Vera, J. (2023). Marco de trabajo basado en Design Sprint y método de cinco diamantes para el proceso de Gestión de Notas del Instituto Florencia de Mora [Tesis, Universidad Privada Antenor Orrego]. https://hdl.handle.net/20.500.12759/11128
Vásquez, W., Vera, J. Marco de trabajo basado en Design Sprint y método de cinco diamantes para el proceso de Gestión de Notas del Instituto Florencia de Mora [Tesis]. PE: Universidad Privada Antenor Orrego; 2023. https://hdl.handle.net/20.500.12759/11128
@misc{renati/379082,
title = "Marco de trabajo basado en Design Sprint y método de cinco diamantes para el proceso de Gestión de Notas del Instituto Florencia de Mora",
author = "Vera Santisteban, Jarson Raul",
publisher = "Universidad Privada Antenor Orrego",
year = "2023"
}
The evaluation guides the work of the teacher and the student, allowing decisions to be made about the adjustments to be made to the teaching and learning process. Once the academic period has started, the teachers will use different teaching and evaluation methodologies that will be reflected in the official records delivered to the academic secretariat area for the consolidation of the grades on the scheduled date, having as a problem that the management of grades is carried out through Through spreadsheets, given the above, the problem is how to improve the note management process of the Florencia de Mora Institute, Year 2021? The research proposes a framework based on Design Sprint and the five-diamond method for the Institute's note management process; therefore, it presents the specific objectives of researching and analyzing Design Sprint and the Five Diamond Method through literature review, designing the framework based on Design Sprint and the Five Diamond Method, and developing the phases of the framework. When developing the framework, it is obtained in the understanding phase, understanding with the interested parties the context of the needs of the institute, in the analysis phase of the processes the AS-IS process diagram was made; in the design phase of the processes, a TO-BE process diagram was made; In the prototyping phase, 29 web interfaces were obtained and in the validation phase, the level of satisfaction and time based on the functional prototype was verified.
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons