Look-up in Google Scholar
Full metadata record
López Carranza, Atilio Rubén
Briceño Torres, Augusto Noe
Cruz Rodríguez, Alan Patrick
Briceño Torres, Augusto Noe
2024-08-09T15:10:53Z
2024-08-09T15:10:53Z
2024
https://hdl.handle.net/20.500.12759/37071
Con el paso de los años los proyectos de construcción bajo una metodología tradicional presentan muchas incongruencias, de esta manera se busca con este estudio la aplicación de la metodología BIM (Building Information Modeling) en la elaboración de proyectos, lo cual nos permite presentar valores más reales y tener una perspectiva de una construcción de manera digital. Mediante el uso de herramientas BIM, realizamos un modelado 3D en el software Revit 2021, importando los planos 2D del expediente técnico para calzar de manera exacta los elementos que lo conforman (Estructura y Arquitectura), conforme se iba avanzando el modelado, se pudo notar pequeñas interferencias. Luego con el análisis en el software Navisworks, donde arrojaron 73 incompatibilidades que se corrigieron posteriormente. A través de la comparativa entre Tradicional y BIM, evidenciamos que en la primera hay carencia de criterio para metrar y se sobremetraron partidas importantes acero y concreto, lo cual condujo un sobrepresupuesto del proyecto. En nuestro estudio del “Local Escolar 1611”, ubicado en el distrito de Mache, se evidencio una reducción en el presupuesto 3.40% equivalente en soles a S/. 37,977.32, con esto permite mejor toma de decisiones entre involucrados, gestión de recursos y evitando posibles adicionales y deductivos en proyectos de infraestructura, puesto que, para edificaciones por ser suma alzada es más complejo la aprobación de una prestación (es_PE)
Over the years, construction projects under a traditional methodology present many inconsistencies. In this way, this study seeks to apply the BIM (Building Information Modeling) methodology in the development of projects, which allows us to present more values. real and have a perspective of a construction digitally. Through the use of BIM tools, we carried out 3D modeling in the Revit 2021 software, importing the 2D plans from the technical file to accurately fit the elements that make it up (Structure and Architecture), as the modeling progressed, it was possible to notice small interferences. Then with the analysis in the Navisworks software, where they showed 73 incompatibilities that were later corrected. Through the comparison between Traditional. and BIM, we show that in the former there is a lack of criteria for metering and important steel and concrete items were overmeasured, which led to an overbudget for the project. In our study of “Local Escolar 1611”, located in the Mache district, a reduction in the budget of 3.40% equivalent in soles to S/. 37,977.32, with this it allows better decision-making among those involved, management of resources and avoiding possible additional and deductive in infrastructure projects, since, for buildings, because it is a lump sum, the approval of a benefit is more complex (es_PE)
Tesis (es_PE)
application/pdf (es_PE)
spa (es_PE)
Universidad Privada Antenor Orrego (es_PE)
T_CIVIL_2556
info:eu-repo/semantics/closedAccess (es_PE)
https://creativecommons.org/licenses/by/4.0/ (es_PE)
Modelado BIM (es_PE)
Revit (es_PE)
Análisis comparativo aplicando la metodología BIM en la Especialidad de Estructuras y Arquitectura del Local Escolar 1611, Distrito de Mache (es_PE)
info:eu-repo/semantics/bachelorThesis (es_PE)
Universidad Privada Antenor Orrego. Facultad de Ingenieria (es_PE)
Ingenieria Civil (es_PE)
Ingeniero Civil (es_PE)
PE (es_PE)
https://purl.org/pe-repo/ocde/ford#2.01.00 (es_PE)
https://purl.org/pe-repo/renati/level#tituloProfesional (es_PE)
32965940
https://orcid.org/0000-0002-3631-2001 (es_PE)
70220309
71559367
732016 (es_PE)
Hurtado Zamora, Oswaldo
Galvez Paredes, José Alcides
Medina Carbajal, Lucio Sigifredo
https://purl.org/pe-repo/renati/type#tesis (es_PE)
Privada asociativa



This item is licensed under a Creative Commons License Creative Commons