Bibliographic citations
Culquimboz, A., (2017). Sistema de abastecimiento de agua potable de la localidad de Chisquilla - distrito de Chisquilla - provincia de Bongará - región Amazonas [Tesis, Universidad Privada Antenor Orrego - UPAO]. https://hdl.handle.net/20.500.12759/3598
Culquimboz, A., Sistema de abastecimiento de agua potable de la localidad de Chisquilla - distrito de Chisquilla - provincia de Bongará - región Amazonas [Tesis]. : Universidad Privada Antenor Orrego - UPAO; 2017. https://hdl.handle.net/20.500.12759/3598
@misc{renati/377412,
title = "Sistema de abastecimiento de agua potable de la localidad de Chisquilla - distrito de Chisquilla - provincia de Bongará - región Amazonas",
author = "Culquimboz Huaman, Alan Homero",
publisher = "Universidad Privada Antenor Orrego - UPAO",
year = "2017"
}
This thesis is a work considered social projection due to the analysis of hydraulic design of water system the Town Center Chisquilla which currently it has supply problems water , because its facilities were Rustically built by the same people without technical criteria in good condition considering only capture which must be done maintenance and replacement of valves and fittings. As a town center still growing their oblation is small. The current beneficiary population is 290 inhabitants, with a density of 5 inhabitants / housing, according to the District Municipality of Chisquilla, there currently 58 homes. The hydraulic approach consists of the following civil works for the drinking water supply has: driveline, clarifier system pre slow filter, reservoir, and adduction line water distribution networks; It has been performed baseline studies for the project as calculation of the future population, topography. We begin by describing generally works to develop in this thesis. The drinking water system is formed by a spring capturing, capturing 0.617l / s, for a projected population of 410 inhabitants. Design and a period of 20 years. The water is fed through a PVC pipe diameter 2 ““ which starts at elevation 2155 meters, and reaches the reservoir at elevation 264.34 meters. For the reservoir it has been estimated capacity 20 m3. Then the water is conducted by a PVC pipe with a diameter of 2”, with a flow of 0617 l / s. to a height of 2056 meters above sea level is a starting point of the distribution network. The central feature of this village is that has been developed according to the topography and which have been taken for a lotización and location of areas for housing uses and other uses of the town. The distribution network is a closed polygon that is reduced its diameter as shown in the drawings. It is noted that the hydraulic design of water network is performed using the software EPANET whose results have achieved better economic design to verify as the different possibilities diameters for the design and comply with the minimum and maximum pressures recommended standards.