Citas bibligráficas
Oblitas, E., (2017). Influencia de la aplicación de nueve áreas del conocimiento de la guía PMBOK a la obra hospital regional de alta complejidad de la libertad [Tesis, Universidad Privada Antenor Orrego - UPAO]. https://hdl.handle.net/20.500.12759/3723
Oblitas, E., Influencia de la aplicación de nueve áreas del conocimiento de la guía PMBOK a la obra hospital regional de alta complejidad de la libertad [Tesis]. : Universidad Privada Antenor Orrego - UPAO; 2017. https://hdl.handle.net/20.500.12759/3723
@mastersthesis{renati/377078,
title = "Influencia de la aplicación de nueve áreas del conocimiento de la guía PMBOK a la obra hospital regional de alta complejidad de la libertad",
author = "Oblitas Mori, Edward Nazar",
publisher = "Universidad Privada Antenor Orrego - UPAO",
year = "2017"
}
The present research work began in September of the year 2016, aims to determine The Influence of the Application of nine areas of knowledge of the PMBOK Guide to the Regional Hospital of High Complexity of Freedom. According to the orientation of the study is Applied. The study included the evaluation of the Regional Hospital of High Complexity of Freedom, identifying the areas that presented problems at the time of its execution, and then proposing improvements in the different areas according to the PMBOK Guide. The information was collected through the scope, technical specifications, plans, budgets, and timelines, interviews with professionals who participated in the execution of the work and the information on the execution in the Info works web portal. The following results were obtained. Of the Nine Areas of Knowledge, only four have positively influenced the execution of the High Complex Complexity Hospital of La Libertad which are Integration Management, Quality Management and Communication Management. And Risk Management, the areas that did not influence positively were the Management of Scope, Time, Cost, Human Resources and Procurement. Improvements were made to implement and improve the areas, which are: Consider significant additional amounts for modifications or extensions of Physical Goals; Perform reprogramming considering double work shifts if necessary; Optimize and implement methodologies in the Construction Process and remove factors that Generate an increase in the cost of the Execution, on the Technical Personnel of the work, perform Selection and change of technical personnel, or conduct training on Coaching, continuous improvement and feedback.
IMPORTANTE
La información contenida en este registro es de entera responsabilidad de la universidad, institución o escuela de educación superior que administra el repositorio académico digital donde se encuentra el trabajo de investigación y/o proyecto, los cuales son conducentes a optar títulos profesionales y grados académicos. SUNEDU no se hace responsable por los contenidos accesibles a través del Registro Nacional de Trabajos de Investigación – RENATI.