Bibliographic citations
Fontenla, C., Herrera (2017). Impacto de las herramientas básicas del sistema Last Planner en el cumplimiento de plazos contractuales en partidas de obras civiles del proyecto Duty Free - Salidas Internacionales - Lima [Tesis, Universidad Privada Antenor Orrego - UPAO]. https://hdl.handle.net/20.500.12759/3573
Fontenla, C., Herrera Impacto de las herramientas básicas del sistema Last Planner en el cumplimiento de plazos contractuales en partidas de obras civiles del proyecto Duty Free - Salidas Internacionales - Lima [Tesis]. : Universidad Privada Antenor Orrego - UPAO; 2017. https://hdl.handle.net/20.500.12759/3573
@misc{renati/376962,
title = "Impacto de las herramientas básicas del sistema Last Planner en el cumplimiento de plazos contractuales en partidas de obras civiles del proyecto Duty Free - Salidas Internacionales - Lima",
author = "Herrera Loarte Renzo Alberto",
publisher = "Universidad Privada Antenor Orrego - UPAO",
year = "2017"
}
The following research on compliance control in the project World Duty Free - International Departures. Being inside the facilities of the International Airport Jorge Chávez (AIJCH), in the city of Lima, Peru; there was no traditional behavior, so it was decided to use the basic tools of the Last Planner System only the control of deadlines compliance in the most critical items of the second phase of the project, in order to report daily compliances, weekly and monthly, in contrast to the projections in the contractual schedule. A monitoring of the system's pre-implementation during 04 weeks in the first phase of the project was started, with the performance of the crews of the most critical items in the base schedule being processed. Obtaining results, from where we will start the implementation of the Last Planner system in the project. The main achievements during the implementation stage of the system The Past Planner was: Improvement in the root causes identification in the multiple constraints occurring during the project. The last planner was positive during the 06 weeks of implementation, obtaining an improvement of 83% in the fulfillment of the scheduled activities. The results projected in the following weeks to culminate the project, guaranteeing customer satisfaction and compliance with the time and costs projected in the planning period.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.