Bibliographic citations
Cerna, E., (2017). Gestión de productividad de la filosofía lean construction en el proceso de relleno en la presa palo redondo [Tesis, Universidad Privada Antenor Orrego - UPAO]. https://hdl.handle.net/20.500.12759/3722
Cerna, E., Gestión de productividad de la filosofía lean construction en el proceso de relleno en la presa palo redondo [Tesis]. : Universidad Privada Antenor Orrego - UPAO; 2017. https://hdl.handle.net/20.500.12759/3722
@mastersthesis{renati/376709,
title = "Gestión de productividad de la filosofía lean construction en el proceso de relleno en la presa palo redondo",
author = "Cerna Chávez, Elvis Fredy",
publisher = "Universidad Privada Antenor Orrego - UPAO",
year = "2017"
}
The present research had as general objective to determine the influence of the Productivity Management of the Lean Construction Philosophy in the process of filling in the ““Palo Redondo““ Dam, in the district of Chao, Viru province, La Libertad region, between the months From August to October 2015, according to the object of study, the type of research was Applied. The research was started knowing the current situation of the filling process in the ““Palo Redondo““ dam, then implemented the tools of the Philosophy of Lean Construction, determining the activities that do not generate value. The required data collections of the fill front were performed using the Balance charts, the daily production and cost reports of the item (provided by the cost office), for one week and follow-up for 02 months, after which the procedure was standardized Of filling, until its culmination. The results of the research were: improvement of the performance of the conformation and compaction activities in 26.83% and 13.70% respectively, increase of average production per day in 44.87%, reduction of unit cost accumulated in US $ 0.114 with respect to its cost Initial, compliance with the execution deadline in October, with a cumulative advance of 70.59%, with an advance of 6.40%. It is concluded that the Productivity Management of the Lean Construction Philosophy influenced the performance improvement in the filling process in the Presa Palo redondo.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.