Jauregui, C., Pairazaman, J. (2016). Aplicación del sistema Last Planner de la filosofía Lean Construction para la generación de valor en la obra Conjunto Residencial Golf los Andes - Etapa II, Lurigancho - Chosica 2014 [Tesis, Universidad Privada Antenor Orrego - UPAO]. https://hdl.handle.net/20.500.12759/2057
Jauregui, C., Pairazaman, J. Aplicación del sistema Last Planner de la filosofía Lean Construction para la generación de valor en la obra Conjunto Residencial Golf los Andes - Etapa II, Lurigancho - Chosica 2014 [Tesis]. : Universidad Privada Antenor Orrego - UPAO; 2016. https://hdl.handle.net/20.500.12759/2057
@misc{renati/376461,
title = "Aplicación del sistema Last Planner de la filosofía Lean Construction para la generación de valor en la obra Conjunto Residencial Golf los Andes - Etapa II, Lurigancho - Chosica 2014",
author = "Pairazaman Cerna, Jorge Carlos Agustin",
publisher = "Universidad Privada Antenor Orrego - UPAO",
year = "2016"
}
The present research paper had as target goal the implementation of a planning and control system called ‘‘The Last Planner® System’’ applied to the Project ‘‘Conjunto Residencial Golf Los Andes - Etapa II ’’, located in the province of Lurigancho- Chosica, Lima, to find out to what extent The Last Planner® System of the Lean Construction philosophy generated value in the items of the structures of the buildings 08 y 09 of the present research. The Last Planner System is a methodology of work that belongs to the lean construction philosophy which has several planning levels where the plan is polished and the uncertainty is reduced; considering only what can be done and not what should be done. In this sense, the present objectives are kept and the project team can help to remove the obstacles to reach the goals, in such a way that the plans are not only intentions but an active work commitment to design the ways to carry out the activities. This system ensures a flux of continuous work and the fulfillment of the activities of a plan through more reliable planification in order to reach a most optimum level of production. The development of this work included the application of “Last Planner System” in the items of the structures of the buildings 08 and 09 of the project mentioned above, during a continuous five-week period from November, Monday 04 th 2013 to December, Friday 06 th 2013; the master plan which was handed in by Los Portales S.A company was divided; then it was made 05 Look Ahead in 4 –week groups each, considering the 1-4 week the first intermediate Plan, from the 2-5 week the second intermediate Plan, from 3-6 the third intermediate Plan, from 4-7 the fourth intermediate Plan, from 5-8 week the fifth intermediate Plan; in which it is shown the estimates for the implementation , the programmed materials and the necessary work force for the established 4 weeks