Rodriguez, D., (2017). Análisis comparativo entre el uso de emulsión asfáltica o asfalto en caliente para ser aplicado en la pavimentación de las calles del AAHH. Huanchaquito - distrito de Huanchaco [Tesis, Universidad Privada Antenor Orrego - UPAO]. https://hdl.handle.net/20.500.12759/3203
Rodriguez, D., Análisis comparativo entre el uso de emulsión asfáltica o asfalto en caliente para ser aplicado en la pavimentación de las calles del AAHH. Huanchaquito - distrito de Huanchaco [Tesis]. : Universidad Privada Antenor Orrego - UPAO; 2017. https://hdl.handle.net/20.500.12759/3203
@misc{renati/376270,
title = "Análisis comparativo entre el uso de emulsión asfáltica o asfalto en caliente para ser aplicado en la pavimentación de las calles del AAHH. Huanchaquito - distrito de Huanchaco",
author = "Rodriguez Rogel, Diana Carolina",
publisher = "Universidad Privada Antenor Orrego - UPAO",
year = "2017"
}
In the present work, we have performed a comparative analysis between the use of asphalt emulsion and asphalt hot in AA.HH Huanchaquito area where soil testing and counting of cars to be designed the pavement I do. The tests performed in the laboratory, have let know that the soil is a sandy and state average compaction is CBR = 14.7 , no water table was found in the sectors studied , the coefficient of drainage used as tables is 1.10 which 's poor ranking on the coast. According counting cars that gave hours of 7:00 am to 9:00 pm , a total of 125 cars whose determination is EAL 576 569 ( Avenue) was obtained. The 93 AASHTO design method for asphalt pavement in hot and Asphalt Emulsion was used , since both dealt with the determination of a flexible pavement , using a spreadsheet program and final design was obtained as 2 ““ asphalt 12 ““base and 8 ““ sub base, using the budget thicknesses hot pavement whose amount is S. / 3'097 , 897.49 and pavement with Asphalt Emulsion is S. / 2'729 , 718.65 . Besides the work schedule shows the time-intensive to implement the project, so the pavement with Asphalt Emulsion has been estimated to require less than 80 days Labor and equipment, and the hot asphalt was estimated 90 days which more labor is used.
IMPORTANTE
La información contenida en este registro es de entera responsabilidad de la universidad, institución o escuela de educación superior que administra el repositorio académico digital donde se encuentra el trabajo de investigación y/o proyecto, los cuales son conducentes a optar títulos profesionales y grados académicos. SUNEDU no se hace responsable por los contenidos accesibles a través del Registro Nacional de Trabajos de Investigación – RENATI.