Castañeda, S., Liñan, L. (2015). Automatización del proceso de estimación de costos en proyectos de ingeniería adoptando las recomendaciones de AACE International para GMI SAC usando un sistema web [Tesis, Universidad Privada Antenor Orrego - UPAO]. https://hdl.handle.net/20.500.12759/1045
Castañeda, S., Liñan, L. Automatización del proceso de estimación de costos en proyectos de ingeniería adoptando las recomendaciones de AACE International para GMI SAC usando un sistema web [Tesis]. : Universidad Privada Antenor Orrego - UPAO; 2015. https://hdl.handle.net/20.500.12759/1045
@misc{renati/375414,
title = "Automatización del proceso de estimación de costos en proyectos de ingeniería adoptando las recomendaciones de AACE International para GMI SAC usando un sistema web",
author = "Liñan Ponce, Luis",
publisher = "Universidad Privada Antenor Orrego - UPAO",
year = "2015"
}
Automation of Cost Estimation in Engineering Projects adopting the recommendations of AACE International for GMI SAC using a Web System“ by: Bach. Castañeda Muñoz, Saúl Bach. Liñan Ponce, Luis This thesis applies the costs area of company Grana y Montero Ingenieros SAC Company, to be one of the most important in the company, because it is the responsible area for estimating and controlling the cost of Investment Projects. The work arises for a problem of overruns constant in error margins expected in project costs estimating, this is the result of a lack of coordination and order in their processes, between identified problems we have: data redundancy in the calculation of the estimate, analysis times very high, information not centralized in a database, and which is carried on sheets of independent calculations, no history based on estimates that allow for the estimates faster and reliability among others. Another major problem is that having no control over their processes do not comply so uniformly the AACEI recommended practices that are applicable in such areas. To solve this problem, it was developed a Web Information System for Cost Estimation of Investment Projects, and integrating some Best Practices that are needed in this process. For the development of this system, it was used ICONIX as software methodology, ASP.NET - Framework 4.5 as programming language, using Telerik Controls Q3 2013 as Database Manager Microsoft SQL Server 2008 R2. This system aims to automate the Estimation process of Cost Area, complying with the recommended practices required under the AACEI. And improve data management that will reduce calculations time on next estimates, reducing margins expected error.
IMPORTANTE
La información contenida en este registro es de entera responsabilidad de la universidad, institución o escuela de educación superior que administra el repositorio académico digital donde se encuentra el trabajo de investigación y/o proyecto, los cuales son conducentes a optar títulos profesionales y grados académicos. SUNEDU no se hace responsable por los contenidos accesibles a través del Registro Nacional de Trabajos de Investigación – RENATI.