Huamán, J., Sabogal, R. (2024). Identificación de riesgos bajo el enfoque del PMBOK en la Obra Mejoramiento y Ampliación del sistema de alcantarillado sanitario del sector Elefante Blanco – Anexo de la Soledad, Distrito de Parcoy, Provincia de Pataz, Departamento de La Libertad [Tesis, Universidad Privada Antenor Orrego]. https://hdl.handle.net/20.500.12759/16792
Huamán, J., Sabogal, R. Identificación de riesgos bajo el enfoque del PMBOK en la Obra Mejoramiento y Ampliación del sistema de alcantarillado sanitario del sector Elefante Blanco – Anexo de la Soledad, Distrito de Parcoy, Provincia de Pataz, Departamento de La Libertad [Tesis]. PE: Universidad Privada Antenor Orrego; 2024. https://hdl.handle.net/20.500.12759/16792
@misc{renati/373540,
title = "Identificación de riesgos bajo el enfoque del PMBOK en la Obra Mejoramiento y Ampliación del sistema de alcantarillado sanitario del sector Elefante Blanco – Anexo de la Soledad, Distrito de Parcoy, Provincia de Pataz, Departamento de La Libertad",
author = "Sabogal Segura, Robert Alejandro",
publisher = "Universidad Privada Antenor Orrego",
year = "2024"
}
The main objective of this study was to develop a risk identification matrix within the framework of the PMBOK approach for the implementation of the Improvement and Expansion Work of the sanitary sewage system in the Elefante Blanco sector - Annex de la Soledad, Parcoy District, Province of Pataz, Department of La Libertad and develop a management plan based on the guidelines proposed in the PMBOK. was going to execute. Guide 6th edition. The risk management process is determined by the steps of risk identification, risk analysis and risk treatment planning, and consists of the following: risk type, risk description, risk causes, risk allocation, strategy, risk treatment measures and risk level. A complete risk matrix has been created; This achieves the overall objective of the study, the findings of the study identify a list of risks and a response plan for each of which will be considered throughout the project cycle, thus optimizing the chances of project success. The conclusion of the qualitative risk analysis was that by using the PMBOK 6ed. guide, which provided us with the tools and strategies that, together with personal criteria, this investigation was developed. It was determined that 100% of the risks identified by natural phenomena were of moderate priority. In the quantitative risk analysis, it could be seen that the probability of meeting the base budget is 49.70%, with a certainty of 95% for the amount of S/ 417,093.27. Finally, the response plan proposal was determined based on qualitative analysis; Greater emphasis is placed on moderate priority and high priority risks, since between the two they represent 89.0% of the total risks