Rodríguez, L., Vergara, E. (2024). Modelo de gestión para proyectos de edificación, basado en el dominio de desempeño de la medición (pmbok 7° ed). Trujillo 2022 [Tesis, Universidad Privada Antenor Orrego]. https://hdl.handle.net/20.500.12759/26391
Rodríguez, L., Vergara, E. Modelo de gestión para proyectos de edificación, basado en el dominio de desempeño de la medición (pmbok 7° ed). Trujillo 2022 [Tesis]. PE: Universidad Privada Antenor Orrego; 2024. https://hdl.handle.net/20.500.12759/26391
@misc{renati/373110,
title = "Modelo de gestión para proyectos de edificación, basado en el dominio de desempeño de la medición (pmbok 7° ed). Trujillo 2022",
author = "Vergara Ibáñez, Erick Gerardo",
publisher = "Universidad Privada Antenor Orrego",
year = "2024"
}
The main objective of this research work is to develop a management model for building projects, based on the measurement performance domain; For which three different projects are evaluated, two multi-family buildings (Trujillo and Piura) and an improvement of health services (Cajamarca). The type of research was quantitative and descriptive and presents two types of research designs, the non-experimental longitudinal trend type, which applies to the first, second and fourth specific objectives; and the type of pre- experiment type experimental design that applies to our third specific objective. The results were a template in Microsoft Excel that condenses a performance evaluation to evaluate performance with respect to the baseline for a project, as well as determining the value of the business and obtaining forecasts of time, cost and profitability of the project. . . It is concluded that for project 1, for both the month of May and the month of August, values of -S/ 1,055,421.15 and -S/ 93,989.56 were obtained, respectively; which shows that the project is behind schedule both in cost and schedule. Regarding the business value for project number 2, referring to the construction of a five-story multifamily building in the city of Piura, a net present value (NPV) of $224,582.57 was obtained, a return on investment (ROIC) of 18.15% and an economic value added (EVA) of $4,843.83; which shows that under the pre-established conditions the project is profitable. Finally, regarding project number 3, it was obtained with 95% certainty that the maximum total duration of the project will be 332.33 days, that is, 39 days more than expected; Likewise, it is expected to have a final cost of the project of S/. 4121326.94, this amount is 17% higher than the expected amount of S/ xii 3,509,225.26; In conclusion, there is a 95% probability that the project will have a higher cost and longer duration