Citas bibligráficas
Burgos, S., Guevara, R. (2022). Propuesta de mejora para disminuir los tiempos de ejecución en el proyecto: Mejoramiento del servicio de transitabilidad de la Av. Luis Ormeño, Casma - Casma – Ancash, aplicando el Last Planner System [Tesis, Universidad Privada Antenor Orrego - UPAO]. https://hdl.handle.net/20.500.12759/9708
Burgos, S., Guevara, R. Propuesta de mejora para disminuir los tiempos de ejecución en el proyecto: Mejoramiento del servicio de transitabilidad de la Av. Luis Ormeño, Casma - Casma – Ancash, aplicando el Last Planner System [Tesis]. PE: Universidad Privada Antenor Orrego - UPAO; 2022. https://hdl.handle.net/20.500.12759/9708
@misc{renati/371201,
title = "Propuesta de mejora para disminuir los tiempos de ejecución en el proyecto: Mejoramiento del servicio de transitabilidad de la Av. Luis Ormeño, Casma - Casma – Ancash, aplicando el Last Planner System",
author = "Guevara Garcia, Roger Edwin",
publisher = "Universidad Privada Antenor Orrego - UPAO",
year = "2022"
}
The execution of the project “IMPROVEMENT OF AV. LUIS ORMEÑO DISTRICT OF CASMA, CASMA PROVINCE, ANCASH DEPARTMENT“, as part of the neighborhood network of the city of Casma. The project proposed with the studies carried out indicates that at present the Ormeño Avenue roadway has an inadequate level of road and pedestrian trafficability, that is to say that it has asphalt roads in terrible conditions in poor condition, and in such a way that even the Water and Sewage Network (Drainage) is already expired with the useful life cycle with the period. That is why we have decided to implement and apply the Last Planner System, to compare the execution times of the main items of the work. This application helps us to improve the productivity time in the labor force in which we will see savings in expenses, an adequate work and above all that it is planned and expedited in the execution, without any delays. The research to be studied has an area of 5,000 m2 in which we have decided to evaluate the items with the highest incidence such as sidewalks (concrete and formwork) and pavement (base, subbase, asphalt binder), for which they are in the execution phase. In conclusion, the main use of the Last Planner System is that it significantly improved the productivity in the construction of the project: Improvement of the trafficability of Luis Ormeño Avenue, Casma - Casma - Ancash, reaching 100% of the planned items and having fulfilled the projected metras in the work.
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons