Bibliographic citations
Cabezas, L., Cortés, G., Ramirez, M., Santa, A. (2019). Uso de la metodología BIM para la mejora del Proyecto de Habilitación Urbana, San Antonio de Pachacamac, Etapa 7 – Manchay [Trabajo de investigación, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/628153
Cabezas, L., Cortés, G., Ramirez, M., Santa, A. Uso de la metodología BIM para la mejora del Proyecto de Habilitación Urbana, San Antonio de Pachacamac, Etapa 7 – Manchay [Trabajo de investigación]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2019. http://hdl.handle.net/10757/628153
@mastersthesis{renati/369597,
title = "Uso de la metodología BIM para la mejora del Proyecto de Habilitación Urbana, San Antonio de Pachacamac, Etapa 7 – Manchay",
author = "Santa Cruz Alcántara, Antonio Gabriel",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2019"
}
This thesis, has the purpose of applying a collaborative work methodology for the management of urban empowerment projects of the Company La Fortaleza, through a simulation of the final product and that forms a database that allows managing the elements that form part of the infrastructure throughout the project life cycle. This methodology is BIM (Building Information Modeling) that allows us to improve the understanding and communication of the project through its 3D visualization, generating, automatically, all the necessary information for the management of work sharing it to all those involved in real time. Urban habilitation is the process of converting a rustic or eriazo land into urban, where the premises of a duly consolidated urban area must have domiciliary public services, tracks, sidewalks and road infrastructure, water networks, sewage and sewage systems and street lighting, how is the San Antonio de Pachacamac project, Stage 7 - Manchay. Object of the study of this thesis. The thesis shows how useful it is to use BIM in the management of an urban habilitation project during the design and construction processes, thus identifying interference in the design stage; comparing with the traditional methodology that in the construction stage identifies the interferences that cause the reprocesses, which quantified represent economic losses, extensions of term, the lack of integration of those involved and poor collaborative management; thus affecting the profitability of the business due to poor construction quality.
This item is licensed under a Creative Commons License