Prudencio, M., Unda, A. (2019). Optimización de la Gestión del Alcance para mitigar los cambios en Edificaciones [Tesis, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/625874
Prudencio, M., Unda, A. Optimización de la Gestión del Alcance para mitigar los cambios en Edificaciones [Tesis]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2019. http://hdl.handle.net/10757/625874
@misc{renati/368566,
title = "Optimización de la Gestión del Alcance para mitigar los cambios en Edificaciones",
author = "Unda Figueroa, Angela",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2019"
}
Título: Optimización de la Gestión del Alcance para mitigar los cambios en Edificaciones
Otros títulos: Optimization of Scope Management to mitigate changes in Buildings
Autor(es): Prudencio Soto, Marco Antonio; Unda Figueroa, Angela
Asesor(es): Palacios Lizier, Carlos Andrés
Palabras clave: Definición de alcance; Control de alcance; Gestión de alcance; Gestión de cambios; Cambios de alcance; Trabajos rehechos; PMI; Riesgo; Análisis de cambios; Causas de los cambios; Atrasos en los plazos; Gestión de Stakeholders; Definition of scope; Scope control; Scope management; Risks Analysis of changes
Fecha de publicación: 14-mar-2019
Institución: Universidad Peruana de Ciencias Aplicadas (UPC)
Resumen: La ineficiente gestión del alcance en proyecto de edificaciones en el Lima genera cambios durante la etapa de ejecución, estos cambios de alcance se convierten en adicionales que causan sobrecostos y afectan al presupuesto contractual.
A fin de mitigar los cambios en edificaciones, se formula un procedimiento para optimizar la gestión del alcance. La propuesta consta de 6 procesos para gestionar el alcance: Estudio de condiciones de sitio y de Stakeholders, Definición de Alcance, Desarrollo de Diseño, Validación del Alcance, Control de OCA’s y Análisis de OCA’s; los cuales están basados en distintas fuentes bibliográficas y de información de proyectos locales.
El producto final que validará la investigación se obtendrá con el procedimiento propuesto retroalimentado en el resultado del análisis de los adicionales aprobados de 3 proyectos de edificación. Dicho análisis consiste en la clasificación de los adicionales en distintos tipos de causantes que serán agrupados, comparados y evaluados de acuerdo a los procesos de gestión de alcance y a las especialidades involucradas, con el objetivo de identificar cuál de estas requieran establecer medidas de mejora.
An inefficient Scope Management in building projects in Lima may generate changes during the execution phase, those Scope changes can become into additional works that causes overcost and variations to the contractual budget. In order to reduce changes in building projects, it has been formulated a procedure to improve the Scope Management and it is composed by 6 processes: Site conditions and Stakeholders Study, Scope definition, Design development, Scope validation, Change orders control and Change orders Analysis; all the processes are based on various bibliographical sources and information of local’s Projects. The final product which will validate the investigation is a feedback of the proposed procedure with the results of the analysis of approved scope changes coming from the building projects studied. This analysis consists of the classification of scope changes according their causes which have been grouped, compared and evaluated in accordance with the Scope management processes and the specialties involved, aiming to identify those that require setting improvement measures.
An inefficient Scope Management in building projects in Lima may generate changes during the execution phase, those Scope changes can become into additional works that causes overcost and variations to the contractual budget. In order to reduce changes in building projects, it has been formulated a procedure to improve the Scope Management and it is composed by 6 processes: Site conditions and Stakeholders Study, Scope definition, Design development, Scope validation, Change orders control and Change orders Analysis; all the processes are based on various bibliographical sources and information of local’s Projects. The final product which will validate the investigation is a feedback of the proposed procedure with the results of the analysis of approved scope changes coming from the building projects studied. This analysis consists of the classification of scope changes according their causes which have been grouped, compared and evaluated in accordance with the Scope management processes and the specialties involved, aiming to identify those that require setting improvement measures.
Enlace al repositorio: http://hdl.handle.net/10757/625874
Disciplina académico-profesional: Ingeniería Civil
Institución que otorga el grado o título: Universidad Peruana de Ciencias Aplicadas (UPC). Facultad de ingeniería
Grado o título: Ingeniero Civil
Fecha de registro: 17-jun-2019