Colque, R., Díaz, F., Durand, O., Solis, J. (2018). Implementación de Proceso de Gestión en la Construcción de Viviendas Multifamiliares Aplicando LPS, Valor Ganado en una MYPE constructora inmobiliaria en la Ciudad de Arequipa [Trabajo de investigación, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/625327
Colque, R., Díaz, F., Durand, O., Solis, J. Implementación de Proceso de Gestión en la Construcción de Viviendas Multifamiliares Aplicando LPS, Valor Ganado en una MYPE constructora inmobiliaria en la Ciudad de Arequipa [Trabajo de investigación]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2018. http://hdl.handle.net/10757/625327
@mastersthesis{renati/367947,
title = "Implementación de Proceso de Gestión en la Construcción de Viviendas Multifamiliares Aplicando LPS, Valor Ganado en una MYPE constructora inmobiliaria en la Ciudad de Arequipa",
author = "Solis Pinto, Jeffrey Johan",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2018"
}
Taken into account the growth in the construction sector which is consistent with the economic growth of the city of Arequipa; in addition to the informality situation of the sector and the environment of competitive and globalized markets; We carry out the present work that consists of the implementation of a process-based management with the application of the methodology of the “Ultimate Planner and“ Earned Value “for the planning and control of the work; which in combination should always be used for continuous improvement during all stages of the project, and thus achieve the desired success. This work has been developed in the project: “Residencial Emmel“; it is a residential complex executed by the company: LD INVERSIONES SAC; which is a MYPE; that has been developing their projects in the city of Arequipa. The first part will consist in the description of the methodologies to be used; to then perform the process management of the work; documenting each of the relevant construction processes. Parallel to this, the term management tools will be applied with the methodology of the last planner to the project under study; In the same way it will be done with the cost control tools with the earned value method. Finally, the results obtained in the work will be exposed; showing the indicators obtained from the application of the mentioned methodologies: performing an analysis of the cost and time management carried out in the project.