Look-up in Google Scholar
Title: Estudio de prefactibilidad para la instalación de una planta productora de ladrillos a base de arcilla, tierra y vidrio molido reciclado
Other Titles: Pre-feasibility study for the installation of a plant producing bricks based on clay, earth and recycled ground glass
Advisor(s): Lizárraga Portugal, Carlos Augusto
OCDE field: https://purl.org/pe-repo/ocde/ford#2.11.04
Issue Date: 2023
Institution: Universidad de Lima
Abstract: El estudio evalúa la viabilidad de la instalación de una planta de ladrillos King Kong en el departamento de Lima. El mercado objetivo es de 40 777,63 Toneladas año de ladrillos King Kong a un precio de venta de S/ 736 soles por millar para canal moderno y tradicional. La planta estará ubicada en el distrito de Puente Piedra con una capacidad de 149,69 Toneladas al día. El proceso de producción propuesto está basado en etapas de molido, tamizado, amasado, extruido, cortado, secado y horneado, utilizando arcilla, tierra y vidrio reciclado de la zona. El área propuesta para la planta es de 11 322,26 m2. La inversión del proyecto asciende a S/ 5 319 994,12 soles financiado 43,93% mediante préstamo de los bancos BCP y Scotiabank; por otra parte, el 56,07% es aporte propio. Se indica que el proyecto tendrá un periodo de recuperación de la inversión en 4 años y 6 meses.

The study assesses the feasibility of installing a King Kong brick plant in the department of Lima. The target market is 40 777,63 tons per year of King Kong bricks at a sale price of S/736 soles per thousand to the traditional channel. The plant will be located in the Puente Piedra district with a capacity of 149,69 tons per day. The proposed production process is based on stages of grinding, sieving, kneading, extruding, cutting, drying and baking, using recycled clay, earth and glass from the area. The proposed area for the plant is 11 322,26 m2. The project investment amounts to S/ 5 319 994,12 soles financed 43,93% through a loan from the banks BCP and Scotiabank; on the other hand, 56,07% is own contribution. It is indicated that the project will have a payback period of the investment in 4 year and 6 months.
Discipline: Ingeniería Industrial
Grade or title grantor: Universidad de Lima. Facultad de Ingeniería y Arquitectura
Grade or title: Ingeniero Industrial
Juror: Flores Pérez, Alberto Enrique; Chavarri Marin de León, Herminia Violeta; Jara Rosado, Jorge Luis; Lizárraga Portugal, Carlos Augusto
Register date: 21-Sep-2023



This item is licensed under a Creative Commons License Creative Commons