Citas bibligráficas
De, R., Suarez, M. (2021). Estudio de prefactibilidad para la instalación de una planta productora de snacks saludables con alto contenido proteico [Universidad de Lima]. https://hdl.handle.net/20.500.12724/13172
De, R., Suarez, M. Estudio de prefactibilidad para la instalación de una planta productora de snacks saludables con alto contenido proteico []. PE: Universidad de Lima; 2021. https://hdl.handle.net/20.500.12724/13172
@misc{renati/235811,
title = "Estudio de prefactibilidad para la instalación de una planta productora de snacks saludables con alto contenido proteico",
author = "Suarez Univazo, Manuel Ignacio",
publisher = "Universidad de Lima",
year = "2021"
}
The main objective of this project is to determine the technological, economic, financial, market and social feasibility for the installation of a plant that produces healthy snacks with high protein content for national consumption. Through a survey of a specific population, it was found that the product would be well accepted at the socioeconomic level “A“, “B“, the sales partners would be through markets and supermarkets. The demand for the project that was calculated for the year 2021 (project start) would be 11,58 tons of finished product until reaching 18 tons of finished product for the project horizon (year 2024). The location of the factory would take place in the Lurin district, in Lima. On the other hand, the factory working capacity was established for the project according to the market size which is 18 tons of finished goods by 2024. The equilibrium point found was 6,36 tons which is the minimum size allowed for the factory. Regarding the installed capacity, the bagging section (manual operation) is the bottleneck, but it would not affect the production plan. The size of the factory has a total area of 325 m2. The economic and financial aspects, for 5 years of project, determined that the investment required is S/ 465 456,57. Being the most profitable to request a financial loan for 70%. The financial IRR is 83% and the financial NPV is S/ 532 201,25 for a COK of 15,53%. Likewise, the recovery period of the investment would be almost 3 years and will generate S/ 4,81 for each S/ 1 invested. Regarding the Social evaluation, the project will generate an Added Value of S/. 4 438 023,16 por a 9,42% WACC. An average of S/ 25 000 is invested to generate a job that provides a productivity of almost S/ 73 000.
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons