Diaz, J., Maire, R. (2022). Estudio de prefactibilidad para la instalación de una planta de producción de kekes de sanky (Corryocactus brevistylus) [Universidad de Lima]. https://hdl.handle.net/20.500.12724/15639
Diaz, J., Maire, R. Estudio de prefactibilidad para la instalación de una planta de producción de kekes de sanky (Corryocactus brevistylus) []. PE: Universidad de Lima; 2022. https://hdl.handle.net/20.500.12724/15639
@misc{renati/234955,
title = "Estudio de prefactibilidad para la instalación de una planta de producción de kekes de sanky (Corryocactus brevistylus)",
author = "Maire Espinoza, Roger Gaston",
publisher = "Universidad de Lima",
year = "2022"
}
This is a pre-feasibility study for the installation of a plant of sanky cakes in Lima in which will be determine the viability of the project from the market, technological, economic, and social point of view. The value proposition of the product is that it is a healthy and nutritive snack. The demand for the project was calculated using an exponential regression based on the demand of cakes in Peru from Euromonitor also using 3 types of segmentation geographic (Lima), Psychographic (Level A & B), Demographic (6 to 55 years), values of intention and intensity obtained from polls also were use. For the first year the demand of the project will be 24 265 862 units, the target market share of the project is 4% which means the demand that must be satisfy is 970 634 units, the next years the demand will increase about 1% per year this means that the demand of 2026 will be 995 771 units. The location of the plant (Lurin, Lima) was determined using the factor ranking tool. The limits of the project are given by the relation Size – Market (995 771 units) and the breakeven point (607 742 units). The project bottleneck is in the baking operation (1 145 113 units), the safety stock is 96 boxes, the terrain size for the plant (571 square meters) was calculated using Guerchet. The total project investment is 1 534781 soles 70% will come from loans and 30% from own capital, the COK (22,88%) was calculated using the CAPM, the NPV is 641 843 soles, the IRR is 59,39%, the payback period is 3.36 years, and the benefit/cost relation is 2,40. The actualized added value is 3 058 203 soles, the created Jobs are 12, 7 of them are operators, the annual production mean is 983 203 units, The density of capital is 127 202 soles. The productivity of the Manpower is 140 458, the capital intensity is 0,5 and the capital productivity is 2.