Bibliographic citations
Torres, J., (2019). Implementación de la gestión de inventarios basado en la metodología Demand Driven Material Requirements Planning para reducir los costos de almacenamiento en la empresa Postes del Norte S.A. 2018-2019, Trujillo [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/22467
Torres, J., Implementación de la gestión de inventarios basado en la metodología Demand Driven Material Requirements Planning para reducir los costos de almacenamiento en la empresa Postes del Norte S.A. 2018-2019, Trujillo [Tesis]. PE: Universidad Privada del Norte; 2019. https://hdl.handle.net/11537/22467
@mastersthesis{renati/1674617,
title = "Implementación de la gestión de inventarios basado en la metodología Demand Driven Material Requirements Planning para reducir los costos de almacenamiento en la empresa Postes del Norte S.A. 2018-2019, Trujillo",
author = "Torres Velasquez, Julio Winston",
publisher = "Universidad Privada del Norte",
year = "2019"
}
ABSTRACT The present investigation is carried out in a manufacturing and development company of Centrifuged Reinforced Concrete Posts. This research aims to determine to what extent the management of inventories based on the methodology "Planning of demand-driven materials requirements" reduces storage costs in the company Postes del Norte of the city of Trujillo during the 2018-2019 period. The research design is pre-experimental pre-test and post-test, in which the measurement of storage costs is performed before the implementation of the methodology, and after the implementation. Regarding the techniques used in the present investigation, the documentary analysis of the accounting records is detailed, as well as costs. In addition, the instruments used in the present investigation are the data record sheets. On the other hand, to develop the implementation of the improvement was made with the diagnosis of inventory management and the diagnosis of storage costs. Subsequently, the aforementioned methodology was implemented. Regarding the results obtained in the present investigation, it was possible to demonstrate through the Student's t-test that the implementation of the DDMRP methodology reduced storage costs. Keywords: Demand Driven Material Requirements Planning, Storage Costs, Planning, Forecasting.
This item is licensed under a Creative Commons License