Title: Estudio de prefactibilidad para la instalación de una planta de fabricación de tuberías de perforación para equipos DTH y rotativos
Other Titles: Prefeasibility study for the installation of a drill pipe manufacturing plant for DTH and rotary drilling rings
Keywords: PendientePendiente
OCDE field: https://purl.org/pe-repo/ocde/ford#2.11.04
Issue Date: 2023
Institution: Universidad de Lima
Abstract: El presente trabajo describe el estudio de prefactibilidad para la instalación de una planta de fabricación de tuberías para equipos de perforación de roca “Down The Hole” (DTH) y Rotativos. Esta investigación está motivada por la falta de plantas productoras de tuberías similares en el país. El Perú al ser un país minero es un mercado perfecto para poder realizar este proyecto; por lo que en los siguientes capítulos se buscará demostrar la viabilidad técnica, de mercado, social, medioambiental y económico - financiera de implementar esta planta. El estudio de mercado realizado dio como resultado que la demanda potencial fuera de 1 921 tuberías para el año 2025. También se determinó que la demanda interna aparente sería de 1 715 tuberías para el año 2025. Además, se obtuvo que la demanda del proyecto para el año 2025 sería de 138 tuberías. Se concluyó que la localización más adecuada es Lima Metropolitana y el distrito de Pucusana respectivamente. Analizando los factores de demanda, recursos productivos, tecnología y punto de equilibrio, se concluye que el tamaño de planta está condicionado por la demanda del mercado. Finalmente se determinó un VANE de S/ 50 202,07 y un VANF de S/ 150 340,52 así como una TIRE de 20% y una TIRF de 25%. El COK se calculó en 18,46% demostrando que el proyecto es factible. La inversión total de S/ 1 504 474 se recuperará tras 4 años 5 meses y 4 días de operación aproximadamente.

The present work describes the pre-feasibility study for the installation of a pipe manufacturing plant for “Down The Hole” (DTH) and rotary drilling rigs. This research is motivated by the lack of similar pipe production plants in the country. Peru being a mining country is a perfect market to carry out this project; Therefore, the following chapters will seek to demonstrate the technical, market, social, environmental, and economic-financial feasibility of implementing this plant. The market study carried out gave as a result that the potential demand was 1 921 pipes for the year 2025. It also determined that the apparent internal demand would be 1 715 pipes for the year 2025. In addition, it was obtained that the demand of the project for the year 2025 would be 138 pipes. It was concluded that the most appropriate location is Lima and the district of Pucusana, respectively. Analyzing the demand factors, productive resources, technology and equilibrium point, it is concluded that the size of the plant is conditioned by the market demand. Finally, the ratios VANE S/ 50 202,07 and VANF S/ 150 340,52 were determined, as well as TIRE of 20% and a TIRF of 25%. The COK was calculated at 18.46% showing that the project is feasible. The total investment of S/ 1 504 474 will be recovered after approximately 4 years 5 months and 4 days of operation.
Discipline: Ingeniería Industrial
Grade or title grantor: Universidad de Lima. Facultad de Ingeniería
Grade or title: Ingeniero Industrial
Juror: Meza Ortiz, Richard Nicholas; Carreño Bardales, Pedro César; Ingar Cangalaya, Araken Andrés; Corzo Chávez, Jorge Antonio
Register date: 16-Jan-2025



This item is licensed under a Creative Commons License Creative Commons