Scotto, C., Uribe, J. (2023). Propuesta de un sistema mecanizado de izaje para mejorar la productividad del ciclo de extracción del pique 110 de la unidad minera La Verdosa [Tesis, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/667302
Scotto, C., Uribe, J. Propuesta de un sistema mecanizado de izaje para mejorar la productividad del ciclo de extracción del pique 110 de la unidad minera La Verdosa [Tesis]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2023. http://hdl.handle.net/10757/667302
@misc{renati/1293742,
title = "Propuesta de un sistema mecanizado de izaje para mejorar la productividad del ciclo de extracción del pique 110 de la unidad minera La Verdosa",
author = "Uribe Perea, Jose Ignacio",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2023"
}
The present research work is entitled: "Proposal of a mechanization model of the hoisting system to improve the productivity of the extraction cycle of the hoist 110 of the La Verdosa mining unit". In the desire of the unit to obtain better results in the extraction cycle of the pick 110, work that began to deepen and explore the continuity of the vein, this work is born from level 110 and is located 8 meters from the main pick that reaches the surface, currently in the work is necessary the presence of up to 04 workers to perform the work of drilling & blasting, cleaning the material (waste / ore) and perform the extraction in a conventional way by exerting force of the worker. This has led to the problem being posed as the inefficiency of the extraction cycle in pit 110 of the La Verdosa mining unit. For this reason, the main objective was to propose a mechanization model of the hoisting system to improve the productivity of the extraction cycle of pit 110. This investigation project has the goal to achieve improvements in the material extraction cycle, to achieve the goal it will be done statistical analysis to accomplish the achievements indicators. In addition, the area of studio will be the “PQ 110” and the “SN 110”, where time measurements were taken Field measurements were made in the mining unit, to take relevant information, process it and be able to carry out statistical analysis, with which it was obtained that the operating cost to extract a wet metric ton from SN 110 was reduced by 42.9%, this improvement was able to reach by reducing the workforce and the extra hours to complete the task. On the other hand, regarding time, the hoisting system is 7.02% faster to complete a hoisting cycle, however, due to the skip capacity of the mechanized system, it only requires 09 cycles on average to culminate with the extraction of a shot from the front.