Moscairo, J., Valdivia, R. (2019). Mejoramiento de la productividad en proyectos de saneamiento básico rural; caso de estudio: Construcción de casetas sanitarias ejecutados por la empresa SICMA S.A.C. en la region de Puno durante los periodos 2016 – 2017 [Trabajo de investigación, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/625897
Moscairo, J., Valdivia, R. Mejoramiento de la productividad en proyectos de saneamiento básico rural; caso de estudio: Construcción de casetas sanitarias ejecutados por la empresa SICMA S.A.C. en la region de Puno durante los periodos 2016 – 2017 [Trabajo de investigación]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2019. http://hdl.handle.net/10757/625897
@mastersthesis{renati/1286073,
title = "Mejoramiento de la productividad en proyectos de saneamiento básico rural; caso de estudio: Construcción de casetas sanitarias ejecutados por la empresa SICMA S.A.C. en la region de Puno durante los periodos 2016 – 2017",
author = "Valdivia Daza, Reynaldo Victor",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2019"
}
The construction sector in Peru is one of the most dynamic in the economy of the country, it is because in recent years the government has been promoting public investment, through the execution of infrastructure projects and especially basic sanitation rural; reason why the company SICMA S.A.C. It has been executing similar projects in different places in the Puno region. The objective of this research is to determine the current state of productivity in 9 rural basic sanitation projects, during the years 2016 and 2017. As a result of analysis of these data, it was determined that the productivity of the labor force in the executed projects of Traditional way is very low because you do not have adequate planning much less control of the execution of these projects. As another objective of this research, the Last Planner system has been implemented, in one of the rural basic sanitation projects with similar characteristics as the previous ones, obtaining improvements regarding the performance of the workforce, increasing productivity. These improvements were evidenced by the comparison of the yields and values of occupation of time, obtained in a traditional way with those obtained by implementing the Last Planner system; remaining with this demonstrated that it is possible the application of tools based on the philosophy Lean Construction in the execution of this type of projects and that with them can improve the productivity and reduce the terms of execution.