Citas bibligráficas
Cordova, P., Lopez, G. (2017). Diseño del sistema de agua potable de los centros poblados de Miraflores y Pucallpa – distrito de Huimbayoc – San Martin – San Martín [Tesis, Universidad Nacional de San Martín. Fondo Editorial]. http://hdl.handle.net/11458/3135
Cordova, P., Lopez, G. Diseño del sistema de agua potable de los centros poblados de Miraflores y Pucallpa – distrito de Huimbayoc – San Martin – San Martín [Tesis]. PE: Universidad Nacional de San Martín. Fondo Editorial; 2017. http://hdl.handle.net/11458/3135
@misc{renati/1057771,
title = "Diseño del sistema de agua potable de los centros poblados de Miraflores y Pucallpa – distrito de Huimbayoc – San Martin – San Martín",
author = "Lopez Tuesta, Gina",
publisher = "Universidad Nacional de San Martín. Fondo Editorial",
year = "2017"
}
This thesis project at the engineering level and its environmental impact of the design of drinking water supply in the towns of Miraflores and Pucallpa - district of Huimbayoc - San Martin region, allows us to provide a solution to a poor supply of drinking water, depriving to the population to meet their most basic needs. To supply drinking water, an adequate potable water service, Installation of Installation and Installation of the Potable Water System, Implementation of a Service Administration Unit, Training for Operative Personnel and Health Education, allowing improving the quality of life of the settlers of the Caseríos de Miraflores and Pucallpa, considering the following points: Construction of 01 Drinking Water supply system there is 01 Caisson with 75.00m capacity built located on the right bank of the Guineo creek (700 meters before its mouth in the Huallaga river), the same as in its upper part the pumping house will be located, which through electric pumps will raise the water a geometric height of 60m. (From 160m to 220m), to the nearest hill, where the drinking water treatment system will be located, which will consist of 01 Desander, 01 Settler, 01 Slow Filter and 01 Chlorination Stall. Following the potable water treatment system, the construction of a supported reservoir with a storage capacity of 55m3 will be executed, from where the two lines of conduction will begin, (one will go to the Miraflores CP, covering a distance of 1,450km. ., and the second will go to the CP of Pucallpa, covering a distance of 4.20km. From there the lines of conduction will feed the existing distribution networks in each locality, and from which each address will already have its respective domiciliary connections
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons