Citas bibligráficas
Pinchi, M., Gomez, L. (2017). Estudio definitivo del camino vecinal SM-676, tramo, PE-5N DV – CC.NN. Pucallpa – CC.NN. Alto Pucalpillo – Emp. SM-104, distrito de Shanao – Lamas –San Martin [Tesis, Universidad Nacional de San Martín. Fondo Editorial]. http://hdl.handle.net/11458/2621
Pinchi, M., Gomez, L. Estudio definitivo del camino vecinal SM-676, tramo, PE-5N DV – CC.NN. Pucallpa – CC.NN. Alto Pucalpillo – Emp. SM-104, distrito de Shanao – Lamas –San Martin [Tesis]. PE: Universidad Nacional de San Martín. Fondo Editorial; 2017. http://hdl.handle.net/11458/2621
@misc{renati/1057515,
title = "Estudio definitivo del camino vecinal SM-676, tramo, PE-5N DV – CC.NN. Pucallpa – CC.NN. Alto Pucalpillo – Emp. SM-104, distrito de Shanao – Lamas –San Martin",
author = "Gomez Ruiz, Luis Francisco",
publisher = "Universidad Nacional de San Martín. Fondo Editorial",
year = "2017"
}
The following work has been developed in the Professional Academic School of Civil Engineering of the Faculty of Civil Engineering and Architecture of the National University of San Martín - Tarapoto, for purposes of qualification as Civil Engineer and to put into practice the lessons learned in the University Classroom. This work was done in order to participate in the solution of the existing road problems in the rural sector of the province of Lamas, since the current situation of the roads in the neighbourhood has problems of transitability, generating that the costs of transportation of the products of the field to the city are high and that the economy of the farmers is affected and therefore the quality of life of the same; moreover, a road in bad condition as the one that has been studied, causes delays and discomfort in the displacement of the field to the city and vice versa, finding that although it is true they take the products from the field to the city, it is also true that the farmer has to return to the countryside carrying the products for subsistence, as well as those required for his agriculture and other activities that take place in the field. So he has participated in the formulation of the project in order to achieve a neighbourhood road affirmed. To develop this work has had to apply all the basic concepts required in the Area of Transportation, to be able to work a road. This implies giving a technical solution to the problem, and all necessary activities are carried out: preliminary visits, topographic survey, topographical calculation, geometric design, of the road, soil and volume movement, transverse and longitudinal drainage, pavement at level of affirmed, formulation of its budget, programming of the Work and elaboration of plans.
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons