Citas bibligráficas
Chujutalli, S., (2017). Estudio definitivo a nivel de afirmado del camino vecinal SM-755(EMP.SM-102-Fausa Lamista-Huingoyacu-Nva. Florida-Emp.SM-102), sector EMP.SM-102-Nueva Florida, L=6.9 Km, distrito de Bellavista, provincia de Bellavista [Tesis, Universidad Nacional de San Martín. Fondo Editorial]. http://hdl.handle.net/11458/2863
Chujutalli, S., Estudio definitivo a nivel de afirmado del camino vecinal SM-755(EMP.SM-102-Fausa Lamista-Huingoyacu-Nva. Florida-Emp.SM-102), sector EMP.SM-102-Nueva Florida, L=6.9 Km, distrito de Bellavista, provincia de Bellavista [Tesis]. PE: Universidad Nacional de San Martín. Fondo Editorial; 2017. http://hdl.handle.net/11458/2863
@misc{renati/1056923,
title = "Estudio definitivo a nivel de afirmado del camino vecinal SM-755(EMP.SM-102-Fausa Lamista-Huingoyacu-Nva. Florida-Emp.SM-102), sector EMP.SM-102-Nueva Florida, L=6.9 Km, distrito de Bellavista, provincia de Bellavista",
author = "Chujutalli Torres, Shirley Yessenia",
publisher = "Universidad Nacional de San Martín. Fondo Editorial",
year = "2017"
}
The work begins with the compilation of the current information, referred to the location, local characteristics and economic partner, photographs, etc. We came to classify the road as THIRD CLASS (local road), SM-755(Emp.SM-102-Fausa Lamista - Huingoyacu - Nva. Florida-EMP.SM-102) Subsequently, the existing roadway was recognized in order to evaluate it and decide on the section in which it needs to be improved: radios, slopes, platform widths, etc. Likewise, we must indicate that the evaluation does not only correspond to the aforementioned parameters, but also that we have taken into consideration the type of soil through which the road crosses. The basic engineering studies were carried out as they are. The topographic and soil study, analysis of quarries and other activities such as: geometric design, traffic study, pavement design at the level of the affirmed and building work budget. The road that connects the towns of Nueva Florida EMP.SM-102 is in terrible conditions, so this work is an important contribution to the development of these peoples. This study originates as part of a mutual agreement between the researchers in coordination with the Mayor of the district of Bellavista, to develop the improvement project of the aforementioned road. Then we proceeded to stake and leveling, which allowed us to obtain the longitudinal profile of the land through which the road crosses. It is in the longitudinal profile where the corresponding analysis has been made to locate the subgrade; the study of soils and quarries was made, for which 14 pits were made, located appropriately along the axis of the road and the different laboratory tests. As in any project of this nature, we must take into account the drainage, which was done by the rational method, a method that is very functional for small areas. The project also includes the analysis of environmental impact, the analysis of costs and budgets, work scheduling, plans and photographs. (Components of a definitive study) Nivel, Afirmado, Camino, Vecinal, Drenaje, Pendiente
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons