Citas bibligráficas
Sanchez, A., (2019). Estudio ambiental del proyecto de construcción de la vía regional Arequipa – La Joya del distrito de Cerro Colorado para la elaboración de la Propuesta de Mitigación Ambiental [Tesis, Universidad Nacional de San Martín. Fondo Editorial]. http://hdl.handle.net/11458/3317
Sanchez, A., Estudio ambiental del proyecto de construcción de la vía regional Arequipa – La Joya del distrito de Cerro Colorado para la elaboración de la Propuesta de Mitigación Ambiental [Tesis]. : Universidad Nacional de San Martín. Fondo Editorial; 2019. http://hdl.handle.net/11458/3317
@misc{renati/1054141,
title = "Estudio ambiental del proyecto de construcción de la vía regional Arequipa – La Joya del distrito de Cerro Colorado para la elaboración de la Propuesta de Mitigación Ambiental",
author = "Sanchez Reyna, Alexandra Victoria",
publisher = "Universidad Nacional de San Martín. Fondo Editorial",
year = "2019"
}
The main objective of this investigation was to elaborate a proposal of environmental mitigation on the project of the construction of the Arequipa - La Joya regional road, from the Cerro Colorado district, after the evaluation of the environmental impact study carried out for said project. The type of the research applied was a descriptive technique one and the research design was a simple descriptive one. The instruments that were used to prepare the environmental mitigation proposal were the environmental impact study, record sheets, environmental monitoring carried out according to the schedule proposed in the project's environmental impact study. The research hypothesis indicated that the evaluation of the environmental impact study of the project would allow defining the environmental mitigation proposal to counteract the environmental impacts that will inevitably occur during the execution of this project, especially due to its large size and territorial extension. The environmental baseline was made to identify the environmental components that were impacted during the execution of the project and with the activities that were carried out during said execution, the level of importance of each impact and its incidence was evaluated. To this end, mitigation measures were proposed for each environmental aspect (air, noise, water, solid waste, flora and fauna). After that, the environmental monitoring was carried out and it was verified that the action methodology was effective for the air, noise and water components. A contingency plan was implemented for quick action in case of incidents during the works and the population was surveyed to know their opinion about the project.
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons