Citas bibligráficas
Pérez, W., Dávila, J. (2022). Optimización de costos en obras de construcción utilizando el método del valor ganado, Tarapoto 2021 [Tesis, Universidad Cientìfica del Perù]. http://hdl.handle.net/20.500.14503/2160
Pérez, W., Dávila, J. Optimización de costos en obras de construcción utilizando el método del valor ganado, Tarapoto 2021 [Tesis]. PE: Universidad Cientìfica del Perù; 2022. http://hdl.handle.net/20.500.14503/2160
@misc{renati/1037385,
title = "Optimización de costos en obras de construcción utilizando el método del valor ganado, Tarapoto 2021",
author = "Dávila Ruiz, Johnny Karon",
publisher = "Universidad Cientìfica del Perù",
year = "2022"
}
In Peru, the construction industry, despite being one of the most artisanal, is a sector of vital importance, not only because it brings together infrastructure projects, which boost the national economy by increasing investment, but also due to its relationship with other industries, through the demand for inputs and construction materials. Studies show that in most cases cost control is done with processes other than deadline control, in addition to the diversity of organizational structures. Similarly, the main factors that cause cost overruns and delays were identified: design changes, soils, poor contracting, inaccurate evaluation of budgets and programming, weather conditions with emphasis on rain. This study proposes a procedure for the organization, control and optimization of costs in construction projects, through field work (construction work) to identify dissatisfactions of the methods used by construction companies to control costs and times. The emerging methodology applied is the Earned Value, as it allows us to compare the execution performance presented through the development of the work against the scheduled performance, through the dimensions of use of resources (budget) and execution time (scheduling). Thus, it is possible to identify its variations (advances and delays) allowing the timely implementation of corrective actions that redirect the development of the project towards a successful conclusion.
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons