Bibliographic citations
Amaringo, Y., Janampa, H. (2023). Comparación del rendimiento de mano de obra y costos del material en asentado y tarrajeo de muro con ladrillo de arcilla y bloques de concreto Iquitos - 2023 [Tesis, Universidad Científica del Perú]. http://hdl.handle.net/20.500.14503/2794
Amaringo, Y., Janampa, H. Comparación del rendimiento de mano de obra y costos del material en asentado y tarrajeo de muro con ladrillo de arcilla y bloques de concreto Iquitos - 2023 [Tesis]. PE: Universidad Científica del Perú; 2023. http://hdl.handle.net/20.500.14503/2794
@misc{renati/1037230,
title = "Comparación del rendimiento de mano de obra y costos del material en asentado y tarrajeo de muro con ladrillo de arcilla y bloques de concreto Iquitos - 2023",
author = "Janampa Quispe, Hector Luis",
publisher = "Universidad Científica del Perú",
year = "2023"
}
The objective of this study is to compare the performance of labor and material in the setting and plastering of walls with clay bricks and mortar blocks. To carry out this investigation, 72 m2 of wall settlement was carried out with clay bricks and 72 m2 with mortar blocks. The wall plastering game was also seen in which the same dimensions were used to make the comparison, in order to meet the proposed objectives and comply with the standards established in CAPECO. The materials used were not subjected to any test since the comparison was made from a conventional form that is being built today. The results of labor and material performance in the wall setting and plastering with clay bricks and mortar blocks are as follows: Performance in laying a wall with clay bricks, labor cost per m2 S/.36.33, material cost per m2 S/.30.37, performance in plastering a wall with clay bricks, labor cost per m2 S/.30.55, material cost per m2 S/.9.89, performance in settling the wall with mortar blocks, labor cost per m2 S/.30.55, material cost per m2 S/.30.97, performance in wall plastering with mortar blocks; labor cost per m2 S/.30.55, material cost per m2 S/.9.89, results obtained in the field, performance in setting the wall with mortar blocks, labor cost m2 S/.22.10, cost of material per m2 S/.30.97. Analyzing the results, a greater performance in labor was obtained in the setting of the wall with mortar blocks compared to the setting of the wall with clay bricks. Finally, it is concluded that, THERE IS VARIATION in the settlement of the wall with clay bricks and mortar blocks. There is no variation in the wall plastering with the two types of material.