La obra en mención tiene un área de 75,000 metros cuadrados y está ubicado en el km 12.5 de la Avenida Néstor Gambetta, Ventanilla, Callao, Perú, destinada al alquiler de espacios para contenedores vacíos. En este contexto, la empresa EXCAVACIÓN & DEMOLICION FIGUEROA SAC es contratada para llevar a cabo trabajos de mejora del terreno. Estos trabajos implicaron la excavación hasta el nivel de subrasante, eliminación del material en un vertedero autorizado, nivelación y compactación de la subrasante. Luego, se añadió una capa de 0.20 metros, seguida de dos capas de subbase de igual espesor y dos capas de base de afirmado de 0.20 metros, utilizando material de la cantera Romaña. El proyecto inició el 16 de diciembre de 2022 y finalizó el 26 de julio de 2023. Surgieron problemas, principalmente con el material y la compactación en algunas etapas. El desafío principal fue que los resultados de compactación no cumplieron los valores previstos en algunas áreas. Esto se debió a que el material adquirido en la cantera no era adecuado, ya que no se realizaron los estudios necesarios para verificar su idoneidad parcialmente. Además, la supervisión por parte del ingeniero residente y el supervisor durante el proceso de compactación no fue efectiva. Nuestra labor como profesionales de la carrera de ingeniería civil y encargados de la partida en mención, fue el de cumplir con el alcance del proyecto y brindar soluciones a los problemas ocurridos en el transcurso del desarrollo del proyecto.
The work in question has an area of ​​75,000 square meters and is located at km 12.5 of Avenida Néstor Gambetta, Ventanilla, Callao, Peru, intended for the rental of spaces for empty containers. In this context, the company EXCAVACIÓN & DEMOLICION FIGUEROA SAC is hired to carry out land improvement work. These works involved excavation to subgrade level, disposal of the material at an authorized landfill, grading and compaction of the subgrade. Then, a 0.20 meter layer was added, followed by two subbase layers of equal thickness and two 0.20 meter cement base layers, using material from the Romaña quarry. The project started on December 16, 2022 and ended on July 26, 2023. Problems arose, mainly with material and compaction at some stages. The main challenge was that the compaction results did not meet the expected values ​​in some areas. This was because the material acquired from the quarry was not suitable, since the necessary studies were not carried out to partially verify its suitability. Furthermore, supervision by the resident engineer and the supervisor during the compaction process was not effective. Our job as professionals in the civil engineering career and in charge of the item in question was to comply with the scope of the project and provide solutions to the problems that occurred during the development of the project.
Trabajo de Suficiencia Profesional (es_PE)
application/pdf (en_US)
application/epub (en_US)
application/msword (en_US)
spa (es_PE)
Universidad Peruana de Ciencias Aplicadas (UPC) (es_PE)
info:eu-repo/semantics/openAccess (es_PE)
http://creativecommons.org/licenses/by-nc-sa/4.0/ (*)
Universidad Peruana de Ciencias Aplicadas (UPC) (es_PE)
Repositorio Académico - UPC (es_PE)
Geomalla
CBR
Afirmado
Compactado
Mejoramiento de terreno
Nivelación
Geogrid
Affirmed
Compacted
Land improvement
Leveling
Proyecto de mejoramiento de terreno para ampliación de contenedores vacíos ubicados en el km 12.5 de la Av. Nestor Gambeta (es_PE)
Land improvement project for expansion of empty containers located at km 12.5 of Av. Néstor Gambetta
info:eu-repo/semantics/bachelorThesis (es_PE)
Universidad Peruana de Ciencias Aplicadas (UPC). División de Estudios Profesionales para Ejecutivos (EPE) (es_PE)
Ingeniería Civil (es_PE)
Licenciatura (es_PE)
Ingeniero Civil (es_PE)
PE (es_PE)
https://purl.org/pe-repo/ocde/ford#2.01.01
https://purl.org/pe-repo/ocde/ford#2.00.00 (es_PE)
https://purl.org/pe-repo/renati/level#tituloProfesional (es_PE)
42084724
0009-0008-1616-5367 (es_PE)
76566644
70244907
732016 (es_PE)
Duran Ramirez, Gary Gary
Cardenas Guillen, Jorge Luis
https://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional (es_PE)
Privada societaria



This item is licensed under a Creative Commons License Creative Commons