El trabajo de suficiencia profesional titulado "Diseño y Construcción del Soporte de la Viga Riostra Superior del Puente Huallaga Utilizando el Sistema Alphakit de PERI" se centró en el desarrollo y la implementación de un importante proyecto de ingeniería civil. El objetivo principal fue diseñar y construir con éxito el soporte de la viga riostra superior del Puente Huallaga, utilizando el innovador sistema Alphakit de la empresa PERI. El proyecto se llevó a cabo con una planificación integral que abordó diversos desafíos, desde la logística de transporte hasta las condiciones climáticas adversas. Durante la ejecución, se proporcionó capacitación exhaustiva al personal, se realizaron evaluaciones continuas de riesgos y se llevaron a cabo inspecciones regulares para garantizar la seguridad y la calidad de la estructura. Se destacó la importancia de mantener registros detallados y fomentar una cultura de mejora continua en la gestión de proyectos. Se consideraron alternativas de diseño y construcción, y se promovió la comunicación efectiva entre todos los miembros del equipo de proyecto. Las recomendaciones resultantes del proyecto incluyen la necesidad de una planificación integral, capacitación del personal, evaluación continua de riesgos y una cultura de mejora continua. También se enfatizó la importancia de la comunicación efectiva, la actualización normativa y la consideración de la sostenibilidad en proyectos futuros. En resumen, el trabajo de suficiencia profesional demuestra la importancia de la planificación, la capacitación, la gestión de riesgos y la mejora continua en proyectos de ingeniería civil. Además, ofrece recomendaciones valiosas para la ejecución exitosa de proyectos similares en el futuro.
The professional proficiency work entitled "Design and Construction of the Support of the Upper Bracing Beam of the Huallaga Bridge Using the PERI Alphakit System" focused on the development and implementation of an important civil engineering project. The main objective was to successfully design and build the support of the upper strut beam of the Huallaga Bridge, using the innovative Alphakit system from the PERI company. The project was carried out with comprehensive planning that addressed various challenges, from transportation logistics to adverse weather conditions. During execution, extensive training was provided to staff, ongoing risk assessments were carried out and regular inspections were carried out to ensure the safety and quality of the structure. The importance of maintaining detailed records and fostering a culture of continuous improvement in project management was highlighted. Design and construction alternatives were considered, and effective communication between all members of the project team was promoted. Recommendations resulting from the project include the need for comprehensive planning, staff training, continuous risk assessment and a culture of continuous improvement. The importance of effective communication, regulatory updating and consideration of sustainability in future projects was also emphasized. In summary, professional proficiency work demonstrates the importance of planning, training, risk management and continuous improvement in civil engineering projects. Furthermore, it offers valuable recommendations for the successful execution of similar projects in the future.
Trabajo de Suficiencia Profesional (es_PE)
application/pdf (en_US)
application/epub (en_US)
application/msword (en_US)
spa (es_PE)
Universidad Peruana de Ciencias Aplicadas (UPC) (es_PE)
info:eu-repo/semantics/openAccess (es_PE)
http://creativecommons.org/licenses/by-nc-sa/4.0/ (*)
Universidad Peruana de Ciencias Aplicadas (UPC) (es_PE)
Repositorio Académico - UPC (es_PE)
Construcción
Transporte
Viga riostra superior
Puente Huallaga
Sistema alphakit de PERI
Construction
Transport
Upper brace beam
Huallaga bridge
PERI alphakit system
Diseño del soporte de la viga riostra superior de la torre de la margen derecha del Puente Huallaga utilizando el sistema Alphakit de la empresa PERI. (es_PE)
Design of the support of the upper brace beam of the tower on the right bank of the Huallaga Bridge using the Alphakit system from the company PERI
info:eu-repo/semantics/bachelorThesis (es_PE)
Universidad Peruana de Ciencias Aplicadas (UPC). División de Estudios Profesionales para Ejecutivos (EPE) (es_PE)
Ingeniería Civil (es_PE)
Licenciatura (es_PE)
Ingeniero Civil (es_PE)
PE (es_PE)
https://purl.org/pe-repo/ocde/ford#2.01.01
https://purl.org/pe-repo/ocde/ford#2.00.00 (es_PE)
https://purl.org/pe-repo/renati/level#tituloProfesional (es_PE)
6692363
0000-0002-8260-4099 (es_PE)
72380635
10867141
732016 (es_PE)
Silvera Lima, Manuel Elias
Torres Diaz, Victor Elias
https://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional (es_PE)
Privada societaria



Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons