Buscar en Google Scholar
Registro completo de metadatos
Uehara Yagi, José Daniel
Cabrera Gil, José Alejandro (*)
Escapa Ramírez, Fredy Enrique (*)
González Junco, Carlos Alberto (*)
Obando Vega, Jooler Alberto (*)
Pinto Luna, William Robert (*)
2019-04-10T16:36:19Z
2019-04-10T16:36:19Z
2018-11-19
Cabrera Gil, J. A., Escapa Ramírez, F. E., González Junco, C. A., Obando Vega, J. A., & Pinto Luna, W. R. (2018, November 19). Propuesta de mejora en la fase de acabados para el suministro e instalación de puertas contra placadas pintadas al duco, en una Obra de edificación de tipo multifamiliar con más de 100 departamentos. Universidad Peruana de Ciencias Aplicadas (UPC), Lima, Perú. Retrieved from http://hdl.handle.net/10757/625455
http://hdl.handle.net/10757/625455
Generalmente, en obras de edificación en la fase de acabados se generan atrasos y reprocesos que impactan en el costo y plazo general de un Proyecto, generando insatisfacción en el cliente y una disminución en el resultado operativo esperado. El presente trabajo de investigación trata del proceso de acabado final en puertas contra placadas pintadas al duco, éste se ve retrasado por falta de personal calificado en cantidad y calidad, además, se ha identificado las causas del problema y este recae en la subdivisión del proceso en 3 actividades: • Suministro de puertas pre pintadas. • Instalación de puertas. • Acabado final de puerta (pintura al ducto). Se ha identificado en cómo perjudica este problema en el proyecto y el resultado es el siguiente: • Disminución del resultado operativo. • Desfase en el plazo de entrega. • Mala reputación e imagen de la empresa constructora. A su vez se han identificado los problemas que generarían si no se solucionan, y serían los sobre costos al cliente (impactos en alquiler) por demoras en entrega de departamento e insatisfacción del cliente (usuario). La manera de evidenciar el problema es mediante indicadores, y los más usados son: PAC (Porcentaje de Actividades Completadas) y Desviación de la Curva S. (en_US)
Generally, in construction jobs, the finishing phase has delays and several setbacks that have an impact on the cost and timeline of a project, creating dissatisfaction in the client, and a decrease in the output expected. The present research job is about the process of the finishing touch of hollow-core-doors that have been painted in a “duco” finish, this is delayed due to the lack of qualified personnel in terms of quantity and quality. Also, we have identified the causes of the problem, and this is due to the subdivision of the process in 3 activities: Catering of pre-painted doors Door Installations Door Finish (“duco” paint) We have identified how these contribute to problems in the project, and the result is the following: A decrease the operating result Gaps in terms of delivery of the completed project Bad reputation and image of the construction company At the same time, we have identified the problems that would be created if these are not solved, and these would increase the quoted price to the client (in terms of rent) due to delays in the delivery of the apartment and the dissatisfaction of the client (user). The manner in which to see the issues is via indicators, and the most used are: PAC (Percentage of Activities Completed) and the Deviation of the S curve. (en_US)
Trabajo de investigación (es_PE)
application/pdf (en_US)
application/epub (en_US)
application/msword (en_US)
spa (es_PE)
Universidad Peruana de Ciencias Aplicadas (UPC) (es_PE)
info:eu-repo/semantics/openAccess (es_PE)
http://creativecommons.org/licenses/by-nc-sa/3.0/us/ (*)
Universidad Peruana de Ciencias Aplicadas (UPC) (es_PE)
Repositorio Académico - UPC (es_PE)
Proyectos de construcción (en_US)
Gestión de la construcción (en_US)
Planificación de la producción (en_US)
Industria de la construcción (en_US)
Gestión de la calidad (en_US)
Proyecto inmobiliario (en_US)
Vivienda multifamiliar (en_US)
Propuesta de mejora en la fase de acabados para el suministro e instalación de puertas contra placadas pintadas al duco, en una Obra de edificación de tipo multifamiliar con más de 100 departamentos (en_US)
info:eu-repo/semantics/masterThesis (es_PE)
Universidad Peruana de Ciencias Aplicadas (UPC). Escuela de Postgrado (es_PE)
Escuela de Postgrado (es_PE)
Maestría (es_PE)
Maestro en Dirección de la construcción (es_PE)
PE (es_PE)
https://purl.org/pe-repo/renati/level#maestro (es_PE)
https://purl.org/pe-repo/renati/type#trabajoDeInvestigacion (es_PE)
Privada societaria



Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons