Bibliographic citations
Ortiz, J., Escalante, P., Gallegos, D. (2018). Mejora de la rentabilidad en proyectos de vivienda social en la zona rural de la sierra sur del perú, aplicando las metodologías bim-lean construction para medianas empresas [Tesis, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/624662
Ortiz, J., Escalante, P., Gallegos, D. Mejora de la rentabilidad en proyectos de vivienda social en la zona rural de la sierra sur del perú, aplicando las metodologías bim-lean construction para medianas empresas [Tesis]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2018. http://hdl.handle.net/10757/624662
@mastersthesis{sunedu/4379085,
title = "Mejora de la rentabilidad en proyectos de vivienda social en la zona rural de la sierra sur del perú, aplicando las metodologías bim-lean construction para medianas empresas",
author = "Gallegos Llacta, Deniht",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2018"
}
Given the problem of housing deficit in the southern highlands of Peru and the low profitability of construction companies in this type of project, this research work seeks to improve profitability in social housing projects in the rural area of the southern highlands of Peru, applying the BIM-LEAN CONSTRUCTION methodologies for medium-sized companies; it seeks to reduce costs, adding value to the product, eliminating waste and losses, increasing collaboration among those involved, simplifying unnecessary processes and optimizing execution times. It begins with the ante-project stage, where an analysis of the process of obtaining the land, urban authorization and required licenses was carried out in order to determine more real costs of the development of housing projects. In addition, the research seeks to increase productivity, applying management tools for the design, planning and construction stages; analyzing the basic requirements of design such as the minimum characteristics of the housing environments, type of facilities, finishes, among others, the design proposal was made with BIM tools and later the programming with the LOOK AHEAD tool is considered. Finally, the cash flow for the economic analysis was elaborated, comparing the financial indicators between the proposal of the research work and the conventional construction. In this way, it is possible to take effective control of social housing projects, guaranteeing compliance with costs and execution times.
This item is licensed under a Creative Commons License