Look-up in Google Scholar
Title: Pruebas eléctricas como factor de ajuste en la coordinación de protecciones, caso: Red MT 20kV - Metro de Lima
Advisor(s): Grados Gamarra, Juan Herber
Issue Date: 2016
Institution: Universidad Nacional del Callao
Abstract: The aim of this thesis is determine through a set of tests done with trains in motion, if the equipment of the medium voltage (MV) system of the old section of the Linea 1 del Metro de Lima, has the required conditions to guarantee the successful operation of trains in the most demanding conditions, it means that trains must go over each three-minute. This is the frequency design of time of trains in motion that was designed for the commercial operation of this transport system.

El objetivo de la presente tesis es determinar mediante up conjunto de pruebas realizadas con la circulación de los trenes, si el equipamiento del sistema de MT del tramo antiguo de la Linea 1 del Metro de Lima, se encuentra en condiciones de ofrecer las garantías necesarias para operar satisfactoriamente en las condiciones más exigentes, siendo esta la circulación de los trenes al intervalo de tres minutos, la frecuencia de circulación de diseño en operación comercial.
Discipline: Ingeniería Eléctrica
Grade or title grantor: Universidad Nacional del Callao. Facultad de Ingeniería Eléctrica y Electrónica
Grade or title: Ingeniero Electricista
Register date: 9-Dec-2016; 9-Dec-2016



This item is licensed under a Creative Commons License Creative Commons