El presente trabajo de investigación tiene como título: “Propuesta de un sistema mecanizado de izaje para mejorar la productividad del ciclo de extracción del pique 110 de la unidad minera La Verdosa”. La necesidad de la mina de obtener mejores resultados en el ciclo de extracción del pique 110, labor que se inició para profundizar y explorar la continuidad de la veta, llevo a que se busquen soluciones a raíz de la baja productividad en el subnivel 110, por eso se realizó la propuesta de la implementación de un sistema mecanizado de izaje para el pique 110. Por otro lado, en el subnivel 110, ubicado a 9.46 metros del nivel principal, es necesario la presencia de hasta 04 trabajadores para realizar los trabajos de perforación & voladura, limpieza del material (desmonte / mineral) y realizar la extracción de forma convencional ejerciendo fuerza del trabajador. Es por esto, que se estableció como objetivo principal proponer un sistema mecanizado de izaje para mejorar la productividad del ciclo de extracción del pique 110. El presente proyecto de investigación tiene como finalidad proponer mejoras en el ciclo de extracción de material en la zona de estudio. Para validar la propuesta se definió como zonas estudio zonas de estudio, el Pique 110 y el Subnivel 110, donde se realizaron estudio de tiempos detallados, además de la toma de datos del sistema de izaje mecanizado en operación. Se realizaron mediciones de tiempos de extracción de material en el pique 110 de la unidad minera, para tomar dicha información. Para tomar una decisión es necesario procesar la información y se realicen análisis estadísticos; con los cuales, se obtuvo que el costo operativo para extraer una tonelada métrica húmeda del SN 110 se redujo en 42.9% con respecto al sistema convencional, esta mejora se basa en la reducción de la cantidad de mano de obra empleada y las horas extras que se empleaba para culminar los trabajos. Por otro lado, respecto al tiempo el sistema de izaje es 7.02% más rápido para culminar un ciclo de izaje. Sin embargo, debido a la capacidad del skip del sistema mecanizado solo requiere de 09 ciclos en promedio para culminar con la extracción de un disparo del frente. (es_PE)
The present research work is entitled: "Proposal of a mechanization model of the hoisting system to improve the productivity of the extraction cycle of the hoist 110 of the La Verdosa mining unit". In the desire of the unit to obtain better results in the extraction cycle of the pick 110, work that began to deepen and explore the continuity of the vein, this work is born from level 110 and is located 8 meters from the main pick that reaches the surface, currently in the work is necessary the presence of up to 04 workers to perform the work of drilling & blasting, cleaning the material (waste / ore) and perform the extraction in a conventional way by exerting force of the worker. This has led to the problem being posed as the inefficiency of the extraction cycle in pit 110 of the La Verdosa mining unit. For this reason, the main objective was to propose a mechanization model of the hoisting system to improve the productivity of the extraction cycle of pit 110. This investigation project has the goal to achieve improvements in the material extraction cycle, to achieve the goal it will be done statistical analysis to accomplish the achievements indicators. In addition, the area of studio will be the “PQ 110” and the “SN 110”, where time measurements were taken Field measurements were made in the mining unit, to take relevant information, process it and be able to carry out statistical analysis, with which it was obtained that the operating cost to extract a wet metric ton from SN 110 was reduced by 42.9%, this improvement was able to reach by reducing the workforce and the extra hours to complete the task. On the other hand, regarding time, the hoisting system is 7.02% faster to complete a hoisting cycle, however, due to the skip capacity of the mechanized system, it only requires 09 cycles on average to culminate with the extraction of a shot from the front. (es_PE)
Tesis (es_PE)
application/msword (es_PE)
application/epub (es_PE)
application/pdf (es_PE)
spa (es_PE)
Universidad Peruana de Ciencias Aplicadas (UPC) (es_PE)
Attribution-NonCommercial-ShareAlike 4.0 International (*)
info:eu-repo/semantics/openAccess (es_PE)
http://creativecommons.org/licenses/by-nc-sa/4.0/ (*)
Universidad Peruana de Ciencias Aplicadas (UPC) (es_PE)
Repositorio Académico - UPC (es_PE)
Hoisting system (es_PE)
Lifting system (es_PE)
Mechanization (es_PE)
Sistema de izaje (es_PE)
Mecanización (es_PE)
Winche (es_PE)
Ciclo de extracción (es_PE)
Winch (es_PE)
Extraction cycle (es_PE)
Propuesta de un sistema mecanizado de izaje para mejorar la productividad del ciclo de extracción del pique 110 de la unidad minera La Verdosa (es_PE)
info:eu-repo/semantics/bachelorThesis (es_PE)
Universidad Peruana de Ciencias Aplicadas (UPC). Facultad de ingeniería (es_PE)
Ingeniería Minera (es_PE)
Licenciatura (es_PE)
Ingeniero de Gestión Minera (es_PE)
PE (es_PE)
https://purl.org/pe-repo/ocde/ford#2.07.05 (es_PE)
http://purl.org/pe-repo/ocde/ford#2.00.00 (es_PE)
https://purl.org/pe-repo/renati/level#tituloProfesional (es_PE)
07450662 (es_PE)
https://orcid.org/0000-0003-2407-0751 (es_PE)
71787827 (es_PE)
71559902 (es_PE)
724016 (es_PE)
Jara Céspedes, Juan
Aramburú Rojas, Vidal Sixto
Perales Orellana, Javier Eduardo
http://purl.org/pe-repo/renati/type#tesis (E)
Privada societaria



This item is licensed under a Creative Commons License Creative Commons